100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NERC CERTIFICATION EXAM TESTBANK LATEST QUESTIONS AND DETAILED CORRECT ANSWERS (VERIFIED ANSWERS) | A+ GRADE $25.99   Add to cart

Exam (elaborations)

NERC CERTIFICATION EXAM TESTBANK LATEST QUESTIONS AND DETAILED CORRECT ANSWERS (VERIFIED ANSWERS) | A+ GRADE

 3 views  0 purchase
  • Course
  • NERC CERTIFICATION
  • Institution
  • NERC CERTIFICATION

NERC CERTIFICATION EXAM TESTBANK LATEST QUESTIONS AND DETAILED CORRECT ANSWERS (VERIFIED ANSWERS) | A+ GRADE 2024- 2025

Preview 4 out of 252  pages

  • November 1, 2024
  • 252
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • NERC CERTIFICATION
  • NERC CERTIFICATION
avatar-seller
TUTORWAC
NERC CERTIFICATION EXAM
TESTBANK LATEST QUESTIONS AND
DETAILED CORRECT ANSWERS
(VERIFIED ANSWERS) | A+ GRADE 2024-
2025

If NERC states that an IROL must be corrected as soon as
possible, but no longer than 30 minutes, but the RC has
indicated that an existing IROL has a Tv of 15 minutes,
which is true about the time to mitigate the IROL
exceedance
A. If NERC and the RC cannot agree utilize your best
judgment
B. The RC can have a more restrictive time imposed to
correct the IROL so you should use the 15 minute criteria
C. Request the RC to bring up the issue at the next RC
working group meeting and utilize the 30 minutes
D. NERC States 30 minutes and that is what you should
adhere to Correct Answer B. The RC can have a more
restrictive time imposed to correct the IROL so you should
use the 15 minute criteria

Two parallel transmission lines are both rated for 450 MVA
and are currently at 320 MVA each. If one of the lines
trips, it will cause the other line to be loaded above its
rating by more than 150 MVA. What should you do if you
receive notification that due to a system emergency one of
the lines must come out of service?

,A. delay the outage until generation can be started
B. redispatch available generation and remove the line
from service
C. Take the line out of service and dump 150 MW of load
D. wait until the line trips out of service Correct Answer B.
redispatch available generation and remove the line from
service

If your system is experiencing dynamic reactive reserve
deficiencies, which of the following actions can be
implemented to increase this dynamic reactive reserve?
A. place a capacitor in service
B. place a reactor in service
C. remove a capacitor from service
D. load transmission lines above SIL Correct Answer A.
place a capacitor in service

The system operator shall have the responsibility and ___
to implement real time actions that ensure the stable and
reliable operation of the BES.
A. Authority
B. experience
C. contingency analysis
D. policies Correct Answer A. Authority

The electric system security data is received over the ___
A. RCIS
B. SDX
C. NERC hotline
D. ISN Correct Answer D. ISN

,If a transmission line has an SOL of 1375 MVA, but due to
parallel flows from external entities interchange
transactions the actual flow is 1525 MVA, what action
should you take?
A. Ignore the limit because the parallel flows total 200
MVA which would bring your native usage down to 1325
MVA
B. Open the line until the external entities curtail the
interchange tags
C. Request the RC to initiate a loading relief procedure
D. Direct the external entities to shed 150MW of load
Correct Answer C. Request the RC to initiate a loading
relief procedure

An appropriate use of a pseudo-tie is to
A. off set meter error
B. Determine ATC
C. account for joint owned generation
D. payback inadvertent Correct Answer C. account for
joint owned generation

All of the reasons listed below are reasons to notify other
systems in your region thru predetermined communication
paths except ___
A. insufficient resources
B. emergency actions for inability to purchase capacity
C. lack of single contingency coverage
D. market implications Correct Answer D. market
implications

, If there is a large system disturbance and the frequency
meters from multiple locations within the BA show different
values, what would be the reasonable conclusion?
A. the info is not accurate
B. the system is in an islanded situation
C. there was a large loss of load
D. the system has blacked out Correct Answer B. the
system is in an islanded situation

If your system experiences the loss of 2000 MW of
generation that has caused the frequency to decline and
you have shed 300 MW of load to stop the frequency from
declining, what should you do if the frequency will not
come above 59.94 Hz?
A. restore the load and wait for RC direction
B. implement additional corrective actions to restore
frequency
C. wait until the system load drops off and monitor the
system frequency
D. request the region to perform a frequency decay
analysis Correct Answer B. implement additional
corrective actions to restore frequency

How long does a TO have to mitigate an IROL
exceedance if it has a T v of 20 minutes?
A. 1/2 of the T v or 10 minutes
B. 20 minutes
C. 30 minutes
D. 60 minutes Correct Answer B. 20 minutes

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller TUTORWAC. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $25.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

81989 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$25.99
  • (0)
  Add to cart