100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ISE 2400 Final Exam Questions Fully Solved Distinction Guaranteed.

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
05-11-2024
Written in
2024/2025

Productivity - correct answer - the efficiency of the production of goods or services Total time of Operation - correct answer - pure work content - defects in design - inefficient work design & methods - time added by poor management - worker shortcomings Frederick Taylor - correct answer - the father of time study study - interested in determining a fair days of work - Taylorism was a system that made work more efficient using work measurement Frank & Lillian Gilbreth - correct answer - the parents of motion study - focused on minimizing motion - studied body motions used in performing task Method Analysis - correct answer - the study of how work is done - details the task and how to do them - each method highlights different findings Work Measurement - correct answer - the amount of time it takes to complete a unit of work - establishes time standards for specific task - predetermined work time system Operation Process Chart - correct answer - chronological sequence of all operations, inspections, time & material needed to make a product - circle = operation - square = inspection Flow Process Chart - correct answer - focuses on movements of an operator or product - identifies hidden cost - circle = operation - arrow = transportation - triangle = storage - D = delay - square = inspection Flow chart/Process Map - correct answer - similar to operation process chart - includes yes/no decision points Deployment/Cross Functional Flowchart - correct answer - illustrates excess movement - shows who is responsible for each step - can determine where flex staffing can be used Value Stream Map - correct answer - assess workflow and identifies waste - follows a product from end to beginning Flow/Spaghetti Diagram - correct answer - flow of work within given layout -evaluates physical layout - shows excessive movement & congestion Paretto Analysis - correct answer - 80/20 rule - 80% of cost, accidents & injuries are accounted by 20% of individuals - bar chart organized from largest to smallest - identifies the biggest opportunities Fishbone Diagram - correct answer - displays causes of problems using fishbone labels - input obtained from all levels - broken into man, machines, materials, methods Date - correct answer - individual facts Information - correct answer - a collection of facts where conclusions can be drawn Predetermined Time Systems - correct answer - based on the work of the Gilbreth's -establishes basic time needed for the performance of various operations - manual activities are combinations of basic elements - reduced motion=reduced time=reduced productivity -eliminates the need for subjective performance ratings Maynard Operation Sequence Technique (MOST) - correct answer - work measurement technique that focuses on the movement of objects General Move - correct answer - moved freely though space Controlled Move - correct answer - movement restricted, attached or in contact Index Values - correct answer - generate the total time needed to preform a task based on parameters Work Measurement - correct answer - data driven process for establishing time standards Engineered Time Standards - correct answer - the appropriate & reasonable amount of time needed to perform a specific task Time Study - correct answer -timing how long it takes good workers to complete each part of their jobs Steps in Time Study - correct answer 1. Measure work content 2. Evaluate operators performance 3. Add in allowances for PFD 4. Calculate time standard PFD - correct answer - personal, fatigue, delay Qualified Employee - correct answer - an average employee who is fully trained and able to perform all phases of work involved Foreign Elements - correct answer - things that are external to the process that delay work Fair Day's Work - correct answer - amount of work that can be completed by a qualified employee when working at a normal pace and effectivel

Show more Read less
Institution
BUSI 2400
Course
BUSI 2400

Content preview

ISE 2400 Final Exam

Productivity - correct answer - the efficiency of the production of goods or services



Total time of Operation - correct answer - pure work content

- defects in design

- inefficient work design & methods

- time added by poor management

- worker shortcomings



Frederick Taylor - correct answer - the father of time study study

- interested in determining a fair days of work

- Taylorism was a system that made work more efficient using work measurement



Frank & Lillian Gilbreth - correct answer - the parents of motion study

- focused on minimizing motion

- studied body motions used in performing task



Method Analysis - correct answer - the study of how work is done

- details the task and how to do them

- each method highlights different findings



Work Measurement - correct answer - the amount of time it takes to complete a
unit of work

- establishes time standards for specific task

- predetermined work time system

, Operation Process Chart - correct answer - chronological sequence of all operations,
inspections,

time & material needed to make a product

- circle = operation

- square = inspection



Flow Process Chart - correct answer - focuses on movements of an operator or
product

- identifies hidden cost

- circle = operation

- arrow = transportation

- triangle = storage

- D = delay

- square = inspection



Flow chart/Process Map - correct answer - similar to operation process chart

- includes yes/no decision points



Deployment/Cross Functional Flowchart - correct answer - illustrates excess
movement

- shows who is responsible for each step

- can determine where flex staffing can be used



Value Stream Map - correct answer - assess workflow and identifies waste

- follows a product from end to beginning



Flow/Spaghetti Diagram - correct answer - flow of work within given layout

-evaluates physical layout

- shows excessive movement & congestion

Written for

Institution
BUSI 2400
Course
BUSI 2400

Document information

Uploaded on
November 5, 2024
Number of pages
8
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
RealGrades Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
172
Member since
2 year
Number of followers
52
Documents
11829
Last sold
2 weeks ago

4.0

26 reviews

5
12
4
5
3
7
2
1
1
1

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions