100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
NCCCO TOWER CRANE FINAL EXAM NEWEST ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS $0.00

Exam (elaborations)

NCCCO TOWER CRANE FINAL EXAM NEWEST ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS

 0 view  0 purchase
  • Course
  • Institution

NCCCO TOWER CRANE FINAL EXAM NEWEST ACTUAL EXAM COMPLETE QUESTIONS AND CORRECT DETAILED ANSWERS

Preview 4 out of 52  pages

  • November 6, 2024
  • 52
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Name: Score:


155 Multiple choice questions

Term 1 of 155
When operating a tower crane and there is an uncontrolled movement, the operator should

Appointed person

Engage emergency stop

Qualified person

Neutral gear

Definition 2 of 155
After erection and each climbing operations

According to asme b30.3 a frequent inspection in heavy service conditions must be
performed

According to asme b30.3 a periodic inspection in heavy service conditions must be
performed

According to ASME B30.3 when shall pre-operational testing be performed

According to asme b30.3 which inspection does not require records to be kept

Term 3 of 155
When you have core failure in wire rope a common result is

Function and Direction - Distance and speed - Function stop

Lubricate threads TCCM bolting 4-8


reduction in diameter ASME 3-2.4.2 (Figure 9)

The lower the spreader angle the greater the tension

,Term 4 of 155
When performing a load test on a tower crane that travels. How should the job be set

So the load is lifted straight up without any sway

So the maximum weight is on the bogie


So the crane is positioned at a 45-degree angle


So the load is evenly distributed across the crane

Definition 5 of 155
Energized until the power company has verified it is not energized

According to ASME B30.3 an overhead power line is ALWAYS considered to be


According to OSHA when lifting personnel the cranes hook must be the types that

According to ASME B30.3 when working near power lines when is a signal person required

According to ASME B30.3, when working near power lines where should caution stickers be
installed

Term 6 of 155
When is it permitted to shift the hoist gear of a tower crane

Neutral Gear

Lower Gear


Parking Brake

Higher Gear

,Term 7 of 155
What is the proper procedure when using an insulating link or a boot near power lines

Stand directly under the power lines

Use any distance as long as it is marked

Ignore the distance and proceed with work


Be sure to maintain the correct allowable distance from the lines

Term 8 of 155
According to OSHA 1926.251 all rigging and rigging hardware must be inspected by a

competent person

qualified person


designated person

work day

Term 9 of 155
What grade alloy steel chain should be used for crane hoisting slings

30 Osha 1910.184


80 OSHA 1910.184

100 Osha 1910.184

50 Osha 1910.184

, Term 10 of 155
According to NCCCO tower crane reference manual when possible installing the hoist wire rope
on a tower crane you should wind the rope with approximately how much of the maximum
permissible load

5% Tccm Wire rope 5-2


20% Tccm Wire rope 5-4

15% Tccm Wire rope 5-3

10% TCCM Wire rope 5-1

Term 11 of 155
According to ASME B30.3 who should be present during climbing or telescoping operation

Driver

Operator

Owner

Manufacturer

Term 12 of 155
Hand Signals to Construction Tower Crane operators shall be those prescribed by

Iso 9001

ASME B30.3

Ansi Z535

Osha 1926.550

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller legittdocument. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $0.00. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
Free
  • (0)