ABYC test CORRECT QUESTIONS & SOLUTIONS
Project A - ANSWER Equipment Division, includes: LPG, propane, etc. systems, galley stoves, fire fighting
equip. AC and refrigeration, heating systems, navigation lights, sound signal appliances, CO detectors,
Galvanic isolators, AC Generator sets, Battery chargers and Inverters, Emergency engine/propulsion cut-
off devices
Project E - ANSWER Electrical Divison, Cathodic protection, AC/DC systems on boats, storage batteries
Project S - ANSWER Industry Conformity Standards, boat capacity labels, boat measurement and weight,
outboard engine, transom and engine well dimensions, outboard engine and related equipment weights
A-1 Marine Liquefied Petroleum Gas (LPG) systems - ANSWER 1.5.1 - General Requirements: Printed
instructions and a labeled diagram(s) covering details of proper installation, maintenance and operation
shall be provided w/ each LPG system on boat. The instructions shall state that a test be made every
time the cylinder supply valve is opened for use and after any events that may have affected the system
such as grounding, fire, or collision. See A-1.10.3.1 and A-1.11.
Project H - ANSWER Hull Division, Boat load capacity, buoyancy in swamping, bilge pump systems,
installation of potable water systems for use on boats, cockpit drainage systems, field of vision from the
helm position, Gasoline and Diesel Fuel Systems
Project P - ANSWER Machinery Divison, Installation of exhaust systems, inboard engines, propeller
shafting systems, steering systems, propulsion control systems, steering wheels, hydraulic steering,
electric steering/propulsion control systems
A-1 Marine Liquefied Petroleum Gas (LPG) systems - ANSWER 1.5.2 Each systems shall be fitted with a
pressure gauge. the gauge shall read the cylinder pressure side of the pressure regulator.