100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
HCAD 325 Final Exam Questions and Answers $16.99   Add to cart

Exam (elaborations)

HCAD 325 Final Exam Questions and Answers

 6 views  0 purchase
  • Course
  • HCAD
  • Institution
  • HCAD

HCAD 325 Final Exam Questions and Answers

Preview 4 out of 37  pages

  • November 7, 2024
  • 37
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • HCAD
  • HCAD
avatar-seller
Zanaya
HCAD 325 Final Exam




Jose is the supervisor of the laboratory. One of his testing machines seems to be giving different results
for the same sample. To make sure he is delivering correct results, Jose uses a second machine to check
the results of the first. This action represents which cost of quality type?



a. Prevention

b. Internal failure

c. Appraisal

d. External failure - Answer-c. Appraisal



Which of the following is not a common theme found in successful Six Sigma programs?



a. Top management support

b. Use of quantitative measures

c. Use of Taguchi methods

d. Team-based projects - Answer-c. Use of Taguchi methods



The term "Six Sigma" represents what goal?

,a. Six standard deviations from the median

b. 3.4 defects per million opportunities

c. Six defects per million opportunities

d. Sigma level quality - Answer-b. 3.4 defects per million opportunities



Jose, the lab manager, wants to improve the quality in his laboratory with a Six Sigma program. He
wants Sandy, his chemistry supervisor, to attend a Six Sigma training program so that she can oversee all
Six Sigma projects that will occur in the lab. Sandy will be trained as a ______________.



a. master black belt

b. yellow belt

c. green belt

d. black belt - Answer-d. black belt



What is the correct project cycle for a Six Sigma project?



a. Analyze, define, measure, improve, control

b. Measure, define, analyze, improve, control

c. Define, measure, analyze, improve, control

d. Define, improve, analyze, control - Answer-c. Define, measure, analyze, improve, control



What variables are measured in the measurement phase of a Six Sigma project?



a. Process duration, process variability, critical to quality

b. Process input, process output, process duration

c. Process input, process output, critical to quality

,d. Process error rate, process output, process duration - Answer-c. Process input, process output,
critical to quality



Which tool is not part of the analyze phase of a Six Sigma project?



a. Regression analysis

b. Gantt chart

c. Pie chart

d. Bar graph - Answer-b. Gantt chart



Jose is checking his laboratory equipment using test control samples that are designed to give the same
results and are used to calibrate the equipment. When he runs 100 samples, he gets two results that are
greater than 3 standard errors of the mean. These results are called what?



a. 2 sigma quality

b. Special variation

c. Error bars

d. Common variation - Answer-b. Special variation



Jose is measuring the time it takes a technician to do a new test. He expects the test to take no more
than 5 minutes and no less than 3 minutes. After observing a number of tests, he calculates the standard
deviation of the test as 0.3 minutes. What is the process capability of the test?



a. 0.0

b. 1.8

c. 1.1

d. 2.0 - Answer-c. 1.1

, Jose has a new test that has three steps. He calculates that in each step some of the sample must be
discarded. Step 1 has a discard rate of 2 percent, step 2 has a discard rate of 5 percent, and step 3 has a
discard rate of 1 percent. How much of the sample is available after step 3?



a. 82.0 percent

b. 75.5 percent

c. 86.5 percent

d. 99.1 percent - Answer-c. 86.5 percent



What is the primary goal of Lean?



a. Eliminate defects

b. Eliminate waste

c. Improve financial performance

d. Maximize employee productivity - Answer-b. Eliminate waste



Tiffany is the day shift supervisor in the imaging department. She has redesigned the patient intake
system so that patients are only asked their name and birthdate once. The old system asked the patient
this information three times. What type of waste did Tiffany reduce?



a. Waiting

b. Motion

c. Overproduction

d. Overprocessing - Answer-d. Overprocessing

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Zanaya. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $16.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

67866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$16.99
  • (0)
  Add to cart