The primary purpose for the balancing area to have Regulation is to correct for: -
✔✔small deviations in load
It is necessary for Generation Owner dispatchers to notify PJM of unplanned unit
outages: - ✔✔as soon as practicable
PJM should be made aware of any fuel shortage that a generator may experience.
This information assists in analyzing the resources and reliably operating the
system. A heightened awareness is expected during: - ✔✔extreme hot or
cold conditions
,Generators are required to obtain PJM approval prior to removing a generating
unit from service.
The only exception is for: - ✔✔injury to personnel will be prevented
Prior to removing a self-scheduled generator from service, the PJM member must
first - ✔✔give PJM the option to takeover the unit for the market
When PJM experiences problems with their primary digital control signal, it
sometimes becomes necessary for companies with the capability, to switch to
the back-up signal.
This backup signal is known as: - ✔✔Analog control
,When PJM sends cost signals to generators, to provide direction for increasing or
decreasing the facility output, this signal that is sent is known as: -
✔✔Dispatch Rate
Under normal operating conditions, what is the limit that will provide the lowest
output level of a generating unit? - ✔✔Eco Min
When PJM send out a cost signal to generators to adjust their output, the
generating personnel adjust the output of the unit base on the unit's - ✔✔price
or cost curve incremental
Which eSuite tool is used to maintain individual generator regulation data that is
submitted by PJM members? - ✔✔eMarket
PJM's ACE configuration is such, that when the ACE is positive (+), it indicates -
✔✔too much generation
, If a generator is self-scheduled, what is the minimum notification time required in
order for the MW output to be adjusted? - ✔✔20 minutes prior to the change
When corrections are made for the time error and the system scheduled
frequency must be changed to implement the correction, how much is the
frequency scheduled adjusted by? - ✔✔+ /- 0.02 Hz
When PJM runs their Regulation test, how long do the tests normally run? -
✔✔40 minutes
Your system has a 300 MW steam unit, but due to oil deliveries, the on-site
fuel supply is diminishing.
What is the hourly threshold for reporting to PJM that the unit cannot operate at
its maximum capacity due to the fuel limitation? - ✔✔72 hours
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Examsplug. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $13.99. You're not tied to anything after your purchase.