100% satisfaction guarantee Immediately available after payment Read online or as PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

HSI Final Test Questions with Correct Answers 100% Pass

Rating
-
Sold
-
Pages
40
Grade
A+
Uploaded on
11-11-2024
Written in
2024/2025

HSI Final Test Questions with Correct Answers 100% Pass The initial response to a frequency deviation is due to which of the following 1. Load / frequency response 2. AGC 3. Governor action 4. Interchange schedules •3 and 4 •1 and 2 •2 and 3 •1 and 3 - ANSWER-•1 and 3 EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator calculates ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will increase by 75 MWs at the top of the hour. What should the operator do? •Maintain current generation level Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED Copyright ©Stuvia International BV Page 2/40 •Decrease generation by 25 MWs •Decrease generation by 50 MWs •Increase generation by 25 MW - ANSWER-•Decrease generation by 25 MWs How is the Frequency Response Measure (FRM) of a Balancing Authority determined? •lt is the average of the BA's frequency response for all the frequency deviations of the previous year •lt is the change in the BA's Net Interchange Actual for the largest frequency deviation during the previous year •lt is the previous year's Control Performance Standard 1 ( CPS1 ) score •It is the median of the BA's frequency response for the frequency deviation events identified by NERC for the previous year - ANSWER-•It is the median of the BA's frequency response for the frequency deviation events identified by NERC for the previous year Sufficient Operating Reserve is defined as the capacity required to meet what? •DOE specifications •CPS and DCS •CPS 1 & 2 only •Capacity Standard - ANSWER-•CPS and DCS Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED Copyright ©Stuvia International BV Page 3/40 In your Interconnection , a generator tripped that was large enough to reduce the frequency from 60.00 Hz to 59.94 Hz . Your Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How many MW would your system initially contribute to frequency support? •120 MW •80 MW •100 MW •200 MW - ANSWER-•120 MW Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your units down . What should you do •Leave AGC in operation but investigate •Place AGC in constant frequency control •Place AGC in flat tie line control •Suspend AGC and investigate - ANSWER-•Suspend AGC and investigate When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC control performance score is affected negatively •DCS Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED Copyright ©Stuvia International BV Page 4/40 •CPS 1 •TEC •BAAL - ANSWER-•CPS 1 Correct Of the following , which control system would be affected by a difference in Net Actual Interchange and Net Scheduled Interchange •Reactive Control •Turbine Governor Control •Automatic Generation Control •Automatic Voltage Regulator - ANSWER-•Automatic Generation Control Balancing Authority A is currently reading a system frequency of 59.98 Hz . Its Net Actual Interchange is +100 MW and its Net Scheduled Interchange is +100 MW . If Balancing Aut

Show more Read less
Institution
Prep Tests
Course
Prep Tests

Content preview

Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED




HSI Final Test Questions with Correct

Answers 100% Pass


The initial response to a frequency deviation is due to which of the following


1. Load / frequency response


2. AGC


3. Governor action


4. Interchange schedules




•3 and 4


•1 and 2


•2 and 3


•1 and 3 - ANSWER✔✔-•1 and 3


EMS and AGC have failed at 12:25 and generation must be controlled manually. The operator calculates

ACE to be +25 MWs. Load is expected to increase 100 MWs, and imports will increase by 75 MWs at the

top of the hour. What should the operator do?




•Maintain current generation level



Copyright ©Stuvia International BV 2010-2024 Page 1/40

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


•Decrease generation by 25 MWs


•Decrease generation by 50 MWs


•Increase generation by 25 MW - ANSWER✔✔-•Decrease generation by 25 MWs


How is the Frequency Response Measure (FRM) of a Balancing Authority determined?




•lt is the average of the BA's frequency response for all the frequency deviations of the previous year


•lt is the change in the BA's Net Interchange Actual for the largest frequency deviation during the

previous year


•lt is the previous year's Control Performance Standard 1 ( CPS1 ) score


•It is the median of the BA's frequency response for the frequency deviation events identified by NERC

for the previous year - ANSWER✔✔-•It is the median of the BA's frequency response for the frequency

deviation events identified by NERC for the previous year


Sufficient Operating Reserve is defined as the capacity required to meet what?




•DOE specifications


•CPS and DCS


•CPS 1 & 2 only


•Capacity Standard - ANSWER✔✔-•CPS and DCS




Copyright ©Stuvia International BV 2010-2024 Page 2/40

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


In your Interconnection , a generator tripped that was large enough to reduce the frequency from 60.00

Hz to 59.94 Hz . Your Balancing Authority's Frequency Bias is -200 MW / 0.1 Hz . How many MW would

your system initially contribute to frequency support?




•120 MW


•80 MW


•100 MW


•200 MW - ANSWER✔✔-•120 MW


Interconnection frequency is 59.80 Hz . Your ACE is a large negative value and your AGC is pulsing your

units down . What should you do




•Leave AGC in operation but investigate


•Place AGC in constant frequency control


•Place AGC in flat tie line control


•Suspend AGC and investigate - ANSWER✔✔-•Suspend AGC and investigate


When a Balancing Authority's ACE value is the same sign as the frequency deviation , which NERC control

performance score is affected negatively




•DCS




Copyright ©Stuvia International BV 2010-2024 Page 3/40

, Copyright © OLIVIAWEST2024/2025 ACADEMIC YEAR. ALL RIGHTS RESERVED


•CPS 1


•TEC


•BAAL - ANSWER✔✔-•CPS 1


Correct Of the following , which control system would be affected by a difference in Net Actual

Interchange and Net Scheduled Interchange




•Reactive Control


•Turbine Governor Control


•Automatic Generation Control


•Automatic Voltage Regulator - ANSWER✔✔-•Automatic Generation Control


Balancing Authority A is currently reading a system frequency of 59.98 Hz . Its Net Actual Interchange is

+100 MW and its Net Scheduled Interchange is +100 MW . If Balancing Authority A's frequency bias

setting is 100 MW / 0.1 HZ , what is ACE




• -20


•20


•2


•0 - ANSWER✔✔-• -20




Copyright ©Stuvia International BV 2010-2024 Page 4/40

Written for

Institution
Prep Tests
Course
Prep Tests

Document information

Uploaded on
November 11, 2024
Number of pages
40
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
OliviaWest Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
111
Member since
1 year
Number of followers
17
Documents
8496
Last sold
1 month ago
Pure Orchid Haven.

All Documents,and package deals offered by seller Olivia West.

2.8

22 reviews

5
6
4
2
3
4
2
1
1
9

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions