What type of estimate is prepared by multiplying the square footage of a building by a cost per square foot? - correct answer Square-foot Estimate By taking off building elements in broad groups, this type of estimate can be prepared fairly quickly (in hours) with moderate accuracy: - corre...

[Show more]

Preview 2 out of 6  pages

  • November 11, 2024
  • 6
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ESTIMATICS.
  • ESTIMATICS.
avatar-seller
Rechga
Estimating Quizzes

What type of estimate is prepared by multiplying the square footage of a building by a cost per square
foot? - correct answer Square-foot Estimate



By taking off building elements in broad groups, this type of estimate can be prepared fairly quickly (in
hours) with moderate accuracy: - correct answer Assembly Estimate



Which of the following is NOT a component of a detailed estimate? - correct answer A/E Fee



What is the formula for using location factors to adjust cost estimates? - correct answer (Index for
City A/Index for City B)*Cost in City B = Cost in City A



What is the formula for using the historical cost index to adjust cost estimates for time? - correct answer
(Index for Year A/Index for Year B)*Cost in Year B = Cost in Year A



What is the base year for the current cost index in RS Means [in the video]? - correct answer 2016



The cost per square foot of a building may be determined by ________ the cost by the size of the
building. - correct answer Dividing



Square-Foot Estimates are more time consuming than? - correct answer Project Comparison
Estimates



Why would a construction firm not use the quantities proved to them for their estimate? - correct
answer Gives the firm a competitive advantage to use their own numbers



What is unbalancing a unit-price bid? - correct answer Heavy loading the cost of the beginning of a
project, while equally lessening the cost of the latter part of the project

, Project overhead is typically _________ percent of the total project cost? - correct answer 5-15



For what type of bid will cost savings typically go directly to the general contractor? - correct answer
Lump Sum (Hard Bid)



What type of bid is procured similar to a lump sum, but profit is limited to a specified amount? - correct
answer GMP



Typically, what type of bid is utilized for heavy civil projects? - correct answer Unit Price



What are the contract documents? - correct answer All the documents that must be signed to legalize
the work between the contractor and the owner



All the documents needed to prepare a complete and accurate estimate.



Why do we need to visit the worksite? - correct answer The information obtained will influence our
bid



To check for unforeseen conditions



What is the addenda? - correct answer The documents issued to bidders before the bid to notify
them of any changes.



What formalizes the contract? - correct answer The Agreement



Which describes Closed Specifications? - correct answer Described by model name or number



Which describes the Bid Documents? - correct answer Agreement, Drawings, General Conditions



If the subs ? quotes come in late, will it affect the overall bid of the project? - correct answer Yes

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Rechga. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75057 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99
  • (0)
  Add to cart