CDS NCARB Sample 2008 Questions With
Complete Solutions
Which of the following project delivery methods always requires preparation of several
individual bid-document packages?
a Design-bid-build
b Fast track
c Design-build
d Turnkey b Fast track
In developing a list of bidders for a priv...
CDS NCARB Sample 2008 Questions With
Complete Solutions
Which of the following project delivery methods always requires preparation of several
individual bid-document packages?
a Design-bid-build
b Fast track
c Design-build
d Turnkey b Fast track
In developing a list of bidders for a private project, the architect's role is to
a select the contractor
b recommend qualified contractors
c rank the contractors in order of preference
d list of proposed material suppliers b recommend qualified contractors
A contractor's ability to obtain a performance bond for a specific construction contract is
determined by the
a owner
, CDS NCARB Sample 2008 Questions With
Complete Solutions
b architect
c contractor
d surety d surety
AIA Document A305 [CCDC 11], Contractor's Qualification Statement, includes a
a financial statement
b list of subcontractors
c list of proposed consultants
d list of proposed material suppliers a financial statement
After considering all bids, the owner favors a bid with irregularities. According to AIA
Document A701, Instructions to Bidders [CCDC 23, A Guide to Calling Bids and Awarding
Contracts], the owner
a has the right to waive irregularities and accept the bid
b has the right to extend the bidding period for corrections
c must informally request corrections from the bidder
, CDS NCARB Sample 2008 Questions With
Complete Solutions
d must only consider bids without irregularities a has the right to waive irregularities and
accept the bid
A local bank has a budget of $30,000,000 to construct a new main office. The bank wants to use
contractors who are customers of the bank; however, none of the bank's contractor customers can
bond the entire amount of the contract. Which of the following is a possible option?
a Design-build
b Fast-track
c Multiple prime contractors
d Additive change orders c Multiple prime contractors
Which of the following is an appropriate agenda item for the prebid conference?
a Occupancy-permit procedures
b Notification of future addenda
c Pre-commissioning procedures
d Status of change orders b Notification of future addenda
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller UpperClass. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $15.99. You're not tied to anything after your purchase.