DC BOILER STATIONARY THIRD TESTING EXAM ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES - A GRADE $9.99
Add to cart

Exam (elaborations)

DC BOILER STATIONARY THIRD TESTING EXAM ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES - A GRADE

 6 views  0 purchase
  • Course
  • Institution

DC BOILER STATIONARY THIRD TESTING EXAM ACTUAL EXAM 200 QUESTIONS AND CORRECT DETAILED ANSWERS WITH RATIONALES - A GRADE

Preview 3 out of 27  pages

  • November 14, 2024
  • 27
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
avatar-seller
Dc Boiler Stationary Third Testing Exam 2024-2025
Actual Exam 200 Questions And Correct Detailed
Answers With Rationales - A Grade
1. The component in which liquid vapor by absorbing heat is called?: Evaporator
2. Select the best answer electrical grounding method?: Metal stake drive 8 foot into
the ground.
3. A _____ valve should be used for throttling purpose?: Globe
4. What is the acceptable range for residual sodium sulfite in the boiler maintain?:
30-70
5. What is the BTU content of a gallon of #4?: 146,000
6. What does a zeolite water softener system use as a means of regeneration?:
Brine
7. What are the 4 steps for a Zeolite Rejuvenation water softener process?: Back
wash
Backwash, brine, rinse, service
8. Where is medium temperature is liquid found?: Condenser
9. Where is high temperature vapor found?: At the discharge of the compressor or
condenser
10. What stays are used to support the burner chamber in a scotch marine boiler?:
Diagonal Stays
11. What type of safety valve is this?: ( Full) Crosby nozzle-type safety valve. Page
365 BOG
12. Where do you found superheat reading?: Take suction line pressure
Cross reference using a P/T Chart
Get tail coil Temperature





, .


Subtract cross references temperature from tail coil temperature
Result will be superheat
13. Name the wire that connects all component of a system to a physical ground or
water pipe?: Grounding Electrode Conductor
14. Where do get sub-cooling reading?: Take liquid line pressure
Cross reference to temperature using a P/T Chart
Get liquid line temperature
Subtract actual temperature from cross referenced temperature
Result is sub-cooling
15. On the boilers that have both Quick opening and Screw type blow down valves,
the Quick opening valve must be located?: Closest to the boiler and followed by
the screw type valve
16. High pressure boilers equipped with Quick opening and Screw type valves are
blown down how?: By opening the Quick opening valve first and closing it Last.
Page 403 BOG
17 ASME Code defines a slow opening valve as what?: One requiring at least 5 full
360 degree turns between full open and close position. Page 374
18. A 300 Horsepower boiler operating at 100psi has an average load of 75% with
80% condensate return and 5% blow down. The treatment provides a chemical
which costs $8.75 per gallon, and will treat 600 gallon. Find the amount of the
chemical needed for the day period, and the cost of the chemical for a 30 days
period?: Water In = Water Out
Makeup + Condensate Return = Evaporator + Blow Down

Average Evaporator Rate = 300 x 34.5 pph x .75% load = 7762, 50 pph

1 Month + .8( 7762.50 pph) = 7762.50 pph + 0500 m




, .


1 Month + 6210 pph = 7762.50 pph + .0500 m
-6210 -6210
1 Month = 1552.5 pph + .0500

.9500 m = 1552.5
pph .9500m .9500

1Month = 1,634.21 pph

Gallons per Month = 1634..33 x 24 x 30 = 141, 252.24 gallons per month
Chemical needed = 141,252.24 gallon / 600 gallon = 235, 40 gallon

Cost per month = 235, 40 gallon x 8.75 = $2,059.75
19. During a 24 hours operation how often should you check the water level?:
Once per shift
20. A 15 psi steam boiler produces 8000 pound of steam per hour. The Minimum
pipe size for the pipe leaving the boiler is___12__inches.
(Density is 0.037 lbs/ft3)
Equation:: D = 12 (C/d/h /.7854)
D = 12 (.037/60) = 3,603.60
D = .ft = 3,927
D = 3.603.,927 = 0.917647058
D = 0.957938963 * 12
D = 11.49 OR 12 "pipe
21 The boiler steam line is 350 Feet long. During start-up the pipe is heated
From 60 F to 350 F. The 350 F. The pipe wills expand__7.92__inches
Due to the change in temperature

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller samuelwachira. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

51036 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 15 years now

Start selling
$9.99
  • (0)
Add to cart
Added