CHAPTER 1: COMMERCIAL BUILDING PLANS AND SPECIFICATIONS
TABLE OF CONTENTS
Review ..........................................................................................................................................................
1
Note To Instructor: It Is Recommended That Students Be Required To Respond, Where Appropriate,
With Answers That Are Complete Sentences.
REVIEW
Refer To The National Electrical Code Or The Working Drawings When Necessary. Where
Applicable, Responses Should Be Written In Complete Sentences.
1. What Section Of A Commercial Building’s Specification Contains A List Of Contract
Documents?
Answer: A List Of The Contract Documents Is Contained In General Clauses And Conditions. A
Listing Of The Commercial Building Contract Documents Is Presented In This Chapter Under
The Heading “Commercial Building Plans.” The Instructor May Wish To Have The Students
Check Over This Listing And Compare It With The Plans Provided.
2. The Requirement For Temporary Light And Power At The Job Site Will Be Found In
What Portion Of A Commercial Building’s Specification?
Answer: The Supplementary General Conditions Specifies The Job Site Requirements For
Temporary Light And Power. In Some Contracts, This Electrical System Becomes The
Responsibility Of The General Contractor; In Other Contracts, It Is The Electrical Contractor’s
Responsibility To Install And Maintain The Temporary Electrical System. The Instructor May
Wish To Refer The Student To NEC Article 590 And Discuss The Requirements In Detail.
,3. The Electrician Uses The Schedule Of Working Drawings For What Purpose?
Answer: The Electrician Uses The Schedule Of Working Drawings To Determine Whether All
Of The Drawings Are At Hand. The Information On “The Other Sheets” May Be Very Important,
Especially In Coordinating With Other Contractors.
4. Complete The Following Items By Indicating The Letter(S) Designating The Correct
Source(S) Of Information:
No. Answer Item Information
4. Sections Ceiling Height Sections, Sheet A6
5. Electrical Electrical Receptacle Electrical Symbol Schedule, Chapter Symbol
Style 2, Figure 2–6 Schedule
6. Electrical Electrical Outlet Electrical Layout Drawings, Sheets
Layout Location El, E2, And E3 Drawings
7. Elevations Exterior Wall Finishes Elevations, Sheets A4 And A5
8. Site Plan Grading Elevations Site Plan, Sheet A4
9. Electrical Panelboard Schedules Electrical Layout Drawings, Sheet E4
Layout Drawings
10. Architectural Room Width Architectural Floor Plan, Sheets Al, Floor Plan A2,
And A3
11. Architectural Swing Of Door Architectural Floor Plan, Sheets Al, Floor Plan A2,
And A3
12. Sections View Of Interior Wall Sections, Sheet A6
Match The Items On The Left With Those On The Right By Writing The Letter
Designation Of The Appropriate Organization From The List On The Right.
, 13. NEC Electrical Code National Electrical Code (NEC)
14. IAEI Electrical Inspectors International Association Of
Electrical Inspectors (IAEI)
15. NFPA Fire Codes National Fire Protection Association
(NFPA)
16. IESNA Lighting Information Illuminating Engineering
Society Of North America
(IESNA)
17. UL Listing Service Underwriters Laboratories, Inc.
(UL)
18. NEMA Manufacturers’ National Electrical Standards Manufacturers
Association
(NEMA)
19. PE Seal Professional Engineer (PE)
Match The Items On The Left With Those On The Right By Writing The
Letter Designation Of The Proper Level Of NEC Interpretation From The List
On The Right.
20. With Allowed By The Code Shall Be Permitted, Or Shall Not Special Be Required,
NEC Permission
21. With May Be Done Shall Be Permitted, Or Shall Not
Special Be Required, NEC Permission
22. Shall Must Be Done Shall, National Electrical Code
23. Shall Required By The Code Shall, National Electrical Code