100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
COB 300 Operations Test 2 (Pal) Questions and Answers $12.49   Add to cart

Exam (elaborations)

COB 300 Operations Test 2 (Pal) Questions and Answers

 0 view  0 purchase
  • Course
  • COB 300
  • Institution
  • COB 300

COB 300 Operations Test 2 (Pal) Questions and Answers

Preview 3 out of 18  pages

  • November 23, 2024
  • 18
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • COB 300
  • COB 300
avatar-seller
millyphilip
COB 300 Operations Test 2 (Pal)
Questions and Answers

Phases of Quality Assurance - Answers -1. Acceptance sampling: inspection
before/after production (least progressive)
2. Process control: inspection and corrective action during production
3. Continuous improvement: quality built into the process (most progressive)

Inspection - Answers -An appraisal activity that compares goods or services to a
standard

Inspection Issues - Answers -1. How much to inspect and how often
2. At what points in the process to inspect
3. Whether to inspect in a centralized or on-site location
4. Whether to inspect attributes or variables

Where to inspect in the process - Answers -1. Raw materials and purchased parts
2. Finished products
3. Before a costly operation
4. Before an irreversible process
5. Before a covering process

Centralized vs On-Site Inspection - Answers -Effects on cost and level of disruption are
major considerations

Centralized - Answers --Specialized tests that may best be completed in a lab
-More specialized testing equipment
-More favorable testing environment

On-Site Inspection - Answers --Quicker decisions are rendered
-Avoided introduction of extraneous factors
-Quality at the source

two basic questions concerning variability - Answers --Issue of Process Control
-Issue of Process Capability

Issue of process control - Answers -Are the variations random? If nonrandom variation
is present, the process is said to be unstable.

Issue of Process Capability - Answers -Given a stable process, is the inherent variability
of the process within a range that conforms to performance criteria?

,Steps required for effective control - Answers --Define: What is to be controlled?
-Measure: How will measurement be accomplished?
-Compare: There must be a standard of comparison
-Evaluate: Establish a definition of out of control
-Correct: Uncover the cause of nonrandom variability and fix it
-Monitor: Verify that the problem has been eliminated

Statistics to manage quality - Answers --Requires less labor (reduces costs)
-Useful when testing destroys products

Categories of statistical tools - Answers --Statistical process control
-Acceptance sampling

Statistical process control - Answers -Assesses whether or not an ongoing process is
preforming within established limits

Acceptance Sampling - Answers -Assesses the quality of parts or products after they
have been produced

Statistical Process Control (SPC) - Answers -A quantitative method for determining
whether a particular process is in or out of control

Process Variations - Answers --Random (common cause) variations
-Assignable (special cause) variations

Random (common cause) variation - Answers -Natural variation in the output of a
process, created by countless minor factors

Assignable (special cause) variation - Answers --Variations whose source can be
identified
-Easy to control/correct

Why are samples taken? - Answers -To determine whether assignable variations are
present in the output of a process

Central Limit Theorem - Answers -Sample means will be normally distributed no matter
whatever distributions the samples follow

Types of Data - Answers --Variable: data that measures a particular product
characteristic (continuous) (length or width)
-Attribute: data that counts items (discrete) - number of defective items in a sample

Variable Charts - Answers -- R chart
- X-bar chart

, Attribute Charts - Answers --p-chart
-c-chart

Fundamental concept in Control Charts - Answers --95.44% of all sample means fall
within +- 2 standard deviations
-99.74% of all sample means fall within +- 3 standard deviations

Generic Control Charts - Answers --Have a center line that is the overall average
-Have limits above and below the center line at +- 3 standard deviations (usually)

Process centering - Answers -- X bar chart
- X bar is a sample mean
- Size of each sample is n

Process Dispersion (consistency) - Answers -- R chart
- R is sample mean

X Bar Charts - Answers --Center line is the grand mean (x double bar)
-Points are X bars

Range (R) Charts - Answers --Center line is the grand mean (R bar)
-Points are R

Run tests - Answers --Even if a process appears to be in control, the data may not
reflect a random process
-Even if points are in the control limits the process must be random

C Charts - Answers --Used to count defects in samples of constant size
-Center line is the grand mean (c bar)
-Number of samples is m

P Charts - Answers --Used to track a proportion (fraction) defective
-Center line is the grand mean (p bar)
-Number of sample is m
-Size of each sample is n

Improving Process Capability - Answers --Simplify
-Standardize
-Mistake-proof
-Upgrade equipment
-Automate

Centered Process - Answers --3 sigma: defects 2,700 parts per million
-6 sigma: defects 0.002 parts per million

Non-Centered Process - Answers --3 sigma: defects 67,000 parts per million

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller millyphilip. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

66579 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart