100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CCAC - Final Exam Questions And Answers (Guaranteed A+) $11.49
Add to cart

Exam (elaborations)

CCAC - Final Exam Questions And Answers (Guaranteed A+)

 0 view  0 purchase

©FYNDLAY EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 | P a g e CCAC - Final Exam Questions And Answers (Guaranteed A+) Which of the following provides the bidders with the procedures that must be followed to submit a complete bid? Bid Form Instructions to Bidders Owner-Contractor Agre...

[Show more]

Preview 2 out of 13  pages

  • November 28, 2024
  • 13
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
All documents for this subject (1)
avatar-seller
Fyndlay
©FYNDLAY EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.



CCAC - Final Exam Questions And Answers
(Guaranteed A+)


Which of the following provides the bidders with the procedures that must be followed to
submit a complete bid?


Bid Form
Instructions to Bidders
Owner-Contractor Agreement

Technical Specifications - answer✔Instructions to Bidders
To be able to do quantity takeoff, the estimator must:


Have patience and the ability to do careful, thorough work
Be able to read and quantify plans
Have a knowledge of mathematics and a keen understanding of geometry

All of the above - answer✔All of the above
T/F - An estimator should be able to look at the drawings to visualize the project through its
various phases of construction. - answer✔True
A detailed estimate includes determination of the quantities and costs of everything required to
complete the project including:


Material and labor costs
Equipment costs and overhead
Insurance, bonds, and profit

All of the above - answer✔All of the above

1|Page

, ©FYNDLAY EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
T/F - The assembly and square-foot methods are typically used for preparing detailed
estimates. - answer✔False
T/F - When preparing a conceptual estimate, typically there are no drawings available or they
drawings are very limited and the contractor makes assumptions about virtually every aspect of
the project. - answer✔True
T/F - The assembly method involves computing the square footage of the building and
multiplying that area by a cost per square foot. - answer✔False
Which of the following modifies the basic contract documents after they have been issued to
the bidder, but prior to the taking of bids?


Addendum
General Conditions
Change Order

Invitation to Bid - answer✔Addendum
`T/F - Project comparison estimates are prepared by comparing the cost of a proposed project
to a completed project. - answer✔True
T/F - The components of an assembly may be limited to a single trade or may be installed by
many different trades. - answer✔True
Which of the following needs to be included in the cost of the materials?


Freight
Storage
Transportation

All of the above - answer✔All of the above
T/F - The estimator's work must be kept organized to the extent that in an unforeseen
circumstance (such as illness or accident), someone else might step in, complete the estimate,
and submit a proposal on the project. - answer✔True
All costs contained on the workup sheets are condensed, totaled, and included on the ______.


pricing sheet


2|Page

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Fyndlay. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

53340 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
Add to cart
Added