Q1 - In requirements engineering, what is the definition of requirements?
a property or capability that a system or subsystem must possess in order to satisfy a contract,
standard, specification, or other formally specified documents
Q2 - Which of the following activities are performed by a requirements engineer?
select and manage stakeholders, check whether all boundary conditions are met, ensure the
traceability of the requirements, and control the detailing of requirements
Q3 - What are the legally binding modal verbs used in requirements engineering to describe
priority?
shall, should, will, and must not
Q4 - In software engineering, not all artifacts have to be in maturity level three at the same time.
What are the latest deadlines in non-Agile projects?
for targets of the system, beginning of system design; for business processes, beginning of system
design; and for interface definition, beginning of system construction
Q5 - Requirements can be divided into three levels based on maturity. What are the definitions of
each level?
At level one, requirements are incomplete, and examples are sufficient; at level two, requirements
are reliable, resilient, and may be incomplete; and at level three, requirements meet all quality
criteria, and are complete and correct.
Unit 2
Q1 - What are the duties of a stakeholder?
A stakeholder delivers the requirements of their special field and supports the requirements
engineer by answering their questions or reviewing their documents.
, Q2 - What are the four different archetypes of stakeholders?
Doers, Powerful, Seismographs, and Observers
Q3 - Which representational transformations can falsify communication?
deletion, which means selectively excluding perception and experiences; generalization, which
means universalizing experiences to a whole category; and distortion, which means reshaping or
falsifying reality
Q4 - Which of the following qualities should requirements have?
full sentences using words defined in a glossary, no synonyms or homonyms, and full verbs for
descriptions
Q5 - What advice should be followed when selecting stakeholders?
Select stakeholders carefully; forgotten stakeholders can lead to expensive change requests.
Integrate the Doers, and release those who do not have time to support.
Unit 3
Q1 - If it turns out that the stakeholders have a low level of abstraction, which investigative
techniques should be used?
field observation, apprenticing, interview, and system archaeology
Q2 - Which prototypes exist in relation to the degree of implemented functionality?
horizontal, which are functions in functional layers; and vertical, which are all required elements
from all layers to realize functionality in a narrow width
Q3 - What is the advantage of questionnaires?
Many stakeholders can be interviewed in parallel, digital questionnaires with closed questions can
be easily evaluated, and stakeholders can be locally distributed.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller DylanHattingh. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $5.53. You're not tied to anything after your purchase.