Building Science Final Exam with
verified solutions
The purpose of the CSI Master Format is to - correct answer ✔✔Organize information and improve
communication
The purpose of the building code is to - correct answer ✔✔protect public health, safety and welfare
This project stakeholder typically generates the ideas and determines the financial feasibility of the
project. - correct answer ✔✔Owner
which of the following affects the allowable building areas of a building? - correct answer ✔✔All of the
above
Utility marking found on the ground for water, sanitary sewer, and power would most likely be marked in
which colors respectively? - correct answer ✔✔Blue, Green, Red
A ten story residential building is covered by which building code? - correct answer ✔✔International
Building Code (IBC)
The IBC is an example of a: - correct answer ✔✔Building Code
All of the following are Occupancy groups, except - correct answer ✔✔Residential
Assembly
-Wood Framing (type V)-
Institutional
Gravity driven utilities such as sanitary and storm sewers are typically installed - correct answer ✔✔From
the bottom up
, Design/build projects are projects that an owner hires an architect to design a very specific program and
then the owner bids the project out for construction to a contractor (T/F) - correct answer ✔✔False
A surveyor can provide - correct answer ✔✔Limits of clearing
Cut/fill elevation
Property Boundaries
Equipment used to compact larger ares of cohesive, clay soils is - correct answer ✔✔Sheeps Foot Roller
Best management practices (BMPs) used to minimize soil erosion on a sloped surface during
construction is a ... - correct answer ✔✔Silt Fence
Dictating means and methods after a project has been bid and contracts executed will most likely result
in a ______ for the owner - correct answer ✔✔Change order
Top layer of a typical asphalt section is the surface or wearing course (T/F) - correct answer ✔✔True
When soil is placed and compacted its volume ________ - correct answer ✔✔decreases
Rebar in structural concrete is typically used to provide support where a concrete beam is in ... - correct
answer ✔✔tension
A typical sequence of construction is.. - correct answer ✔✔Clearing, grubbing, stripping, stockpiling
Sanitary sewer pipe installation typically includes easily compatible bedding material of - correct answer
✔✔No. 57 Stone
in-situ soil refers to.. - correct answer ✔✔Soil situated in its original, natural place
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller BravelRadon. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $17.99. You're not tied to anything after your purchase.