100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ETM 1040 Technical Management Fundamentals Exam Study Guide. $10.49
Add to cart

Exam (elaborations)

ETM 1040 Technical Management Fundamentals Exam Study Guide.

 0 view  0 purchase
  • Course
  • ETM 1040
  • Institution
  • ETM 1040

©THEBRIGHT EXAM SOLUTIONS 2024/2025 ALL RIGHTS RESERVED. 1 ETM 1040 Technical Management Fundamentals Exam Study Guide. Question 3 TO2.EO4: A Systems Engineering Plan (SEP) should cover: (Select three answers) - Answers**Validation and verification test scenarios -Systems Engineering Proces...

[Show more]

Preview 2 out of 9  pages

  • December 13, 2024
  • 9
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • ETM 1040
  • ETM 1040
avatar-seller
Thebright
©THEBRIGHT EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.


ETM 1040 Technical Management
Fundamentals Exam Study Guide.


Question 3 TO2.EO4: A Systems Engineering Plan (SEP) should cover: (Select three answers) -
Answers✔**Validation and verification test scenarios
-Systems Engineering Processes
**The Key Performance Parameters (KPPs), as well as statutory and regulatory requirements the
program must meet
**How configuration Management will be used to control the program's technical baseline
INCORRECT
**important design considerations
-which measures will be used and how they will be used to asses technical progress
**systems engineering processes
**detailed validation and verification procedures
INCORRECT

Question 8 TO4.EO2: A good requirement contains which of the following? - Answers✔**A
single shall statement
Question 23 TO8.EO3: Interface Management problems can account for up to ___% of project
costs, and it is critical to establish work processes for managing interface related issues. Failure
to have an established interface Management plan poses a significant risk of schedule delays,
cost over runs and failure to meet performance objectives. - Answers✔**20
Question 4 TO2.EO3: A technical management plan which provides top-level details of the
planned technical effort is the: - Answers✔**Systems Engineering plan (SEP)
Question 5 TO6.EO1: In traditional acquisition programs, what must be done before modifying
an operation system? - Answers✔-an operation system can only be modified to meet any
approved baseline and/or variance

1

, ©THEBRIGHT EXAM SOLUTIONS 2024/2025

ALL RIGHTS RESERVED.
-maintainers must approve the modification
**change in approved Engineering Change proposal (ECP) must be verified and validation
Question 6 TO5.EO2: From the mitigation step in the DoD Risk management process, what are
the four mitigation options? - Answers✔**accept, avoid, transfer, or control
Question 7 TO4.EO3: You should ____________ the requirements for the system model between
baselines, especially those requirements that are considered critical - Answers✔**track
-guide

Question 26 TO1.EO5: Modeling and Simulation can be used to: - Answers✔**support the
verification and validation go technical processes to evaluate the performance and maturity of
the technologies being considered
Question 14 TO4.EO1: All the of following are key functions of the requirements management
process except ______________. - Answers✔**developing the best set of requirements possible
Question 25 TO6.EO2: How does an agile developer get approval to start modifications to the
baseline? - Answers✔**the work is the highest priority in the backlog
Question 20 TO4.EO4: Which of the following is not a requirements traceability task? -
Answers✔document
Question 12 TO7.EO2: what should engineers not do when assisting Data Management (DM)? -
Answers✔**require government or unlimited use rights for all products
Question 13 TO8.EO5: True or False: the primary focus of interoperability certification and joint
interoperability testing is to determine (evaluation) whether or not the system conforms to
applicable interoperability standards and can effectively exchange all required information with
all pertinent systems. - Answers✔**True
Question 13 TO1.EO3: True or False: Modeling and Simulation are outputs of the Decision
Analysis process - Answers✔**False
Question 15 TO2.EO1: What is the primary purpose of the Technical Planning process? -
Answers✔**to establish and maintain management plans that direct the technical effort of a
program
Question 16 TO1.EO4: Modeling and Simulation (M&S) is chosen over other evaluation
techniques when you: - Answers✔**don't have a lot of data to help support your decision
making




2

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Thebright. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

52928 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.49
  • (0)
Add to cart
Added