ATPL-071 - Operational Procedures refers to a section of the Airline Pilot License (ATPL) program devoted to practices and guidelines to follow to ensure safe and efficient flight operations. Key elements included in this area include:
Normal procedures: Standard flight phases including takeoff,...
, • Part of the airline
• Carry out periodic audits
• The Operations Manual must be followed • Refers to operation of commercial aircraft • Recommended if MCTOM >20,000kg
except for emergencies • Applies to passenger and cargo ops • Mandatory if MCTOM >27,000kg
• PIC is responsible for following procedure • Provides Standards and Recommended • Includes a Safety Review Board
Practices (SARPs) ▪ Chaired by the Accountable Manager (or
a Line Captain)
• Part A – General/Basic (Company Wide) ▪ Allocates appropriate resources
• Part B – Type Specific • I – Definitions • The Safety Manager should:
• Part C – Aerodrome and Routes • II – ARO – Authority ▪ Carry out periodic safety reports
• Part D – Training • III – ORO – Operators (Organization ▪ Facilitate hazard identification
• Prepared in English but may be translated to Requirements) • Communication to individual employees
suit staffing needs • IV – CAT – Commercial Air Transport depends on their specific safety
• Crew members must receive Part A and B for • V – SPA – Specific Approvals responsibilities
personal study
• Alternate – Usable aerodrome if required • Wing Lights (Red and Green)- 110° Range
• MOPSC - Maximum Operational Passenger • Destination Alternate – Alternate • Rear Light ( ) - 140° Range
Seating Configuration aerodrome if the destination is unusable • Only required at night
• MCTOM – Maximum Certified Take-Off Mass • Enroute Alternate – Alternate for enroute • Always steady (not flashing)
• Commercial Air Transport – Transporting emergencies
passengers, cargo or mail for remuneration • ETOPS Alternate – Alternate for emergencies
or other valuable consideration occurring during ETOPS
• Takeoff Alternate – Alternate if departure
aerodrome cannot be returned to
• Flight Time – Considered as brakes off
brakes on time
• Contains identity of the AMO (Part 145) and
identity of the engineer (Part 66)
, • Made by the manufacturer or designer • Large companies have Operations and • Certificate of Registration
• Always less restrictive than the MEL Maintenance systems • Certificate of Airworthiness
• Must be approved by the Manufacturers • Approved by the authority • Noise Certification
State Authority • A form of internal auditing (feedback system) • AOC
• Aircraft Radio License
• Third Party Liability Insurance
• Found in Ops Manual Part B • Must have an accountable manager • Valid Flight Crew License
• Written by the Operator • Other post holders include:
• Approved by the Operators State Authority ▪ Flight Ops
• Only relevant stationary prior to departure ▪ Maintenance System • Mass and Balance
• When moving, use the Abnormal and ▪ Crew Training • Operational Flight Plan
Emergency Procedures Checklists ▪ Ground Operations • NOTAMs
• Operations outside the MEL only allowed • >21 employees = Complex Company • Special Loads
with authority approval • Tech Log
• 90 days to reflect changes from MMEL
They must prevent…
• People in parts of the plane not designed for • State does ramp inspections of paperwork
• Category A – Repaired by the time specified accommodation within a reasonable period (10 days)
in the Remarks/Exceptions • Passengers using portable electronic devices • Commander must allow access to the flight
• Category B – 3 consecutive days • Boarding of intoxicated individuals deck unless it impacts safety
• Category C – 10 consecutive days • Unauthorized admission to the flight deck • FDR kept after an accident for 60 days
• Category D – 120 consecutive days • Carriage of unauthorized people/cargo
• Starts at midnight that night
• Expires 1 minute after midnight • Dry Lease – No crew provided operated
• Includes flight and cabin crew under AOC of the lessee
• Additional crew member – Not associated ▪ Dry Lease In must be <7 months in a 12
with operational or safety duties consecutive month period (non-EU)
• Crew members speak the same language
• Cabin crew must report anything they see to • Wet Lease – Crew provided operated under
• Ops Manual must at least be in English
the Commander AOC of the lessor
• Anything that occurs that affects safety of
other flights must be reported to ATS
• Flight data monitoring program required if
immediately
MCTOM >27,000kg
• Other occurrences reported within 72 hours
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller decarpentryaimeric. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.38. You're not tied to anything after your purchase.