INCOSE ASEP- SUCCESS SHEET
Four Process Groups - Answers :Techical Processes
Technical Management Processes
Agreement Processes
Organizational Project Enabling Processes
Fourteen Technical Processes - Answers :Business or Mission Analysis
Stakeholder Needs & Requirement Definition
System Requirements Definition
Architecture Definition
Design Definition
System Analysis
Implementation
Integration
Verification
Transition
Validation
Operation
Maintenance
Disposal
Eight Technical Management Processes - Answers :Project Planning
Project Assessment & Control
Decision Management
Risk Management
Configuration Management
Information Management
Measurement
Quality Assurance
Two Agreement Processes - Answers :Acquisition
Supply
Six Organizational Project Enabling Processes - Answers :Livecycle Model
Management
Infrastructure Management
Portfolio Management
Human Resource Management
Quality Management
Knowledge Management
Technical Process: To define the business or mission problem or opportunity,
characterize the solution space, and determine potential solution classes that could
, address a problem or take advantage of an opportunity - Answers :Business or Mission
Analysis
Technical Process: To realize a specified system - Answers :Implementation Process
Technical Process: To synthesize a set of system elements into a realized system that
satisfies system requirements, architecture, and design - Answers :Integration Process
Technical Process: To provide objective evidence that a system or system element fulfill
its specified requirements and characteristics - Answers :Verification Process
Seven Verification Techniques - Answers :Inspection
Analysis
Demonstration
Test
Analogy or Similarity
Simulation
Sampling
Verification Process: Based on visual or dimensional examination of an element; relies
on human senses or uses simple methods of measurement; generally non destructive;
use of sight, hearing, smell, touch, and taste - Answers :Verification Process: Inspection
Verification Process: Based on analytical evidence obtained without any intervention on
submitted element using mathematical or probabilistic calculation, logical reasoning,
modeling, or simulation - Answers :Verification Process: Analysis
Verification Process: Used to show correct operation of the submitted element against
operational and observable characteristics without using physical measurements -
Answers :Verification Process: Demonstration
Verification Process: Performed on the submitted element by which functional,
measurement characteristics, operability, supportability, or performance capability is
quantitatively verified subject to controlled conditions that are real or simulated -
Answers :Verification Process: Test
Verification Process: Based on evidence of similar elements to be the submitted
element or on experience feedback - Answers :Verification Process: Analogy or
Similarity
Verification Process: Performed on models or mock-ups for verifying features and
performance as designed. - Answers :Verification Process: Simulation
Verification Process: Based on verification of characteristics using samples - Answers
:Verification Process: Sampling
Four Process Groups - Answers :Techical Processes
Technical Management Processes
Agreement Processes
Organizational Project Enabling Processes
Fourteen Technical Processes - Answers :Business or Mission Analysis
Stakeholder Needs & Requirement Definition
System Requirements Definition
Architecture Definition
Design Definition
System Analysis
Implementation
Integration
Verification
Transition
Validation
Operation
Maintenance
Disposal
Eight Technical Management Processes - Answers :Project Planning
Project Assessment & Control
Decision Management
Risk Management
Configuration Management
Information Management
Measurement
Quality Assurance
Two Agreement Processes - Answers :Acquisition
Supply
Six Organizational Project Enabling Processes - Answers :Livecycle Model
Management
Infrastructure Management
Portfolio Management
Human Resource Management
Quality Management
Knowledge Management
Technical Process: To define the business or mission problem or opportunity,
characterize the solution space, and determine potential solution classes that could
, address a problem or take advantage of an opportunity - Answers :Business or Mission
Analysis
Technical Process: To realize a specified system - Answers :Implementation Process
Technical Process: To synthesize a set of system elements into a realized system that
satisfies system requirements, architecture, and design - Answers :Integration Process
Technical Process: To provide objective evidence that a system or system element fulfill
its specified requirements and characteristics - Answers :Verification Process
Seven Verification Techniques - Answers :Inspection
Analysis
Demonstration
Test
Analogy or Similarity
Simulation
Sampling
Verification Process: Based on visual or dimensional examination of an element; relies
on human senses or uses simple methods of measurement; generally non destructive;
use of sight, hearing, smell, touch, and taste - Answers :Verification Process: Inspection
Verification Process: Based on analytical evidence obtained without any intervention on
submitted element using mathematical or probabilistic calculation, logical reasoning,
modeling, or simulation - Answers :Verification Process: Analysis
Verification Process: Used to show correct operation of the submitted element against
operational and observable characteristics without using physical measurements -
Answers :Verification Process: Demonstration
Verification Process: Performed on the submitted element by which functional,
measurement characteristics, operability, supportability, or performance capability is
quantitatively verified subject to controlled conditions that are real or simulated -
Answers :Verification Process: Test
Verification Process: Based on evidence of similar elements to be the submitted
element or on experience feedback - Answers :Verification Process: Analogy or
Similarity
Verification Process: Performed on models or mock-ups for verifying features and
performance as designed. - Answers :Verification Process: Simulation
Verification Process: Based on verification of characteristics using samples - Answers
:Verification Process: Sampling