Exam (elaborations)
NGA 31 & 40 - Installing PE/Steel Pipes (31A), Installing Pipe in an excavation (31B) Horizontal Boring (31D), Dead Insertion (31E), Replacing Tracer Wire (40) *BASIC 8 OQs* Original Set [Notes based on the NGA 31/40 Student Manual written by Industrial T
- Course
- Institution
NGA 31 & 40 - Installing PE/Steel Pipes (31A), Installing Pipe in an excavation (31B) Horizontal Boring (31D), Dead Insertion (31E), Replacing Tracer Wire (40) *BASIC 8 OQs* Original Set [Notes based on the NGA 31/40 Student Manual written by Industrial Training Services] Backfill Refilling an e...
[Show more]