[Show more]A Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. 
What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - b) An inaccurate load forecast 
B...
Preview 2 out of 13 pages
Add to cartA Balancing Authority notices that Operating Reserve has steadily declined throughout the hour. 
What is the most likely cause? 
a) Loss of a large generator in the area 
b) An inaccurate load forecast 
c) Loss of a major transmission line 
d) A malfunction of EMS - b) An inaccurate load forecast 
B...
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded 
at 1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All au...
Preview 4 out of 73 pages
Add to cart1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded 
at 1400 MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors would trip off-line 
c. Generator MVAR output would decrease 
d. All au...
The Reliability Coordinator just informed you of a slow time error correction which will begin at 
the top of the next hour. Your EMS system will not let you change your scheduled frequency. 
Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
A) Increase Net Interchange Sched...
Preview 4 out of 103 pages
Add to cartThe Reliability Coordinator just informed you of a slow time error correction which will begin at 
the top of the next hour. Your EMS system will not let you change your scheduled frequency. 
Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? 
A) Increase Net Interchange Sched...
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - D. Interruptible loads 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complying with DCS as if it was a single control area ...
Preview 4 out of 43 pages
Add to cartOperating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - D. Interruptible loads 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complying with DCS as if it was a single control area ...
When current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
a) half as much 
b) does not change 
c) doubles 
d) four times greater - d) four times greater 
What determines the size of insulators used on power lines? 
a) Current flow on the line 
b) Voltage level...
Preview 4 out of 42 pages
Add to cartWhen current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
a) half as much 
b) does not change 
c) doubles 
d) four times greater - d) four times greater 
What determines the size of insulators used on power lines? 
a) Current flow on the line 
b) Voltage level...
Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a 
phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What 
two measured parameters of the line caused the distance relay to operate? 
Temperature and length 
MWs a...
Preview 2 out of 15 pages
Add to cartTwo phase conductors of a 138kV transmission line come in contact due to a storm, creating a 
phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What 
two measured parameters of the line caused the distance relay to operate? 
Temperature and length 
MWs a...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller Tulloch. Stuvia facilitates payment to the seller.
No, you only buy these notes for $30.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
79271 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now