[Show more]Splices in rall tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish 
moving load where it was designated to go 
If load is undetermined who is to find out ...
Preview 3 out of 20 pages
Add to cartSplices in rall tracks shall have - Smooth Joints 
Hydraulic systems should have their proper fluid level checked - Daily 
If power fails during operations, the following shouldn't apply - Do your best to finish 
moving load where it was designated to go 
If load is undetermined who is to find out ...
Which OSHA regulation applies to crane in construction industry? - 1926.1400 
Which OSHA regulation applies to cranes used in general industry? - 1910.180 
Which ANSI/ ASME standard applies to the use of mobile cranes? - ANSI/ASME B30.5 
Which OSHA regulation applies to mobile cranes using a personn...
Preview 1 out of 3 pages
Add to cartWhich OSHA regulation applies to crane in construction industry? - 1926.1400 
Which OSHA regulation applies to cranes used in general industry? - 1910.180 
Which ANSI/ ASME standard applies to the use of mobile cranes? - ANSI/ASME B30.5 
Which OSHA regulation applies to mobile cranes using a personn...
What is the max included angle for a shackle? - 120 Degrees 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency 
of? - 80 % 
The center of gravity location of a load may _________of the load - Not be located on the 
actual physical body 
A sling that is rigge...
Preview 1 out of 4 pages
Add to cartWhat is the max included angle for a shackle? - 120 Degrees 
Wire rope clips and wedge sockets shall be designed to have a minimum connection efficiency 
of? - 80 % 
The center of gravity location of a load may _________of the load - Not be located on the 
actual physical body 
A sling that is rigge...
Crane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or 
mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. ...
Preview 2 out of 8 pages
Add to cartCrane configuration includes: 
A. reeving, boom length, counterweight, on outriggers, on rubbers, extensions or jibs stowed or 
mounted, off sets, wire rope type or construction 
B. hoist drum speeds, line pull, wire rope size and rigging 
C. load charts, LMI, axle weights and center of gravity 
D. ...
As you boom, down the leverage of the load on the crane will: - Increase 
According to B30.5, a crane operator shall have a physical examination - Every three years 
Most manufactures require the crane to be level within? - 1 percent 
According to OSHA 1926.1411, when traveling a crane under a power...
Preview 2 out of 6 pages
Add to cartAs you boom, down the leverage of the load on the crane will: - Increase 
According to B30.5, a crane operator shall have a physical examination - Every three years 
Most manufactures require the crane to be level within? - 1 percent 
According to OSHA 1926.1411, when traveling a crane under a power...
Unless the manufacture states otherwise, the net capacity of a crane is the capacity listed in the 
load chart? - Minus the weight of the rigging and all attachments 
When installing wire rope cable clamps (clips), the saddle of the clamp must be - Applied to 
the live side 
Compacted clay has a gro...
Preview 1 out of 4 pages
Add to cartUnless the manufacture states otherwise, the net capacity of a crane is the capacity listed in the 
load chart? - Minus the weight of the rigging and all attachments 
When installing wire rope cable clamps (clips), the saddle of the clamp must be - Applied to 
the live side 
Compacted clay has a gro...
1. What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescop...
Preview 3 out of 21 pages
Add to cart1. What action does a signal person intend the operator to perform if he extends his arm at 
shoulder height, makes a fist with his hand, and sticks his/her thumb up? 
a. Boom down 
b. Swing 
c. Boom up 
d. Extend boom - c. 
2. When hoisting personnel, within what percentage of level must a telescop...
Where is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add 
the rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Incre...
Preview 2 out of 7 pages
Add to cartWhere is the best location for leveling a crane? - Upperworks 
When determining the "gross load" the best method is: - Get an accurate load weight and add 
the rigging. 
By order of hitch strength, which is the correct answer? - Basket, vertical, choker 
What is the purpose of using a jib? - Incre...
Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the 
crane to the center of gravity of the load 
What applies to...
Preview 2 out of 7 pages
Add to cartWhich area do truck cranes without a 5th outrigger generally have no lifting capacity unless the 
manufacturer states otherwise? - The front 
What is the definition of "operating radius?" - The distance from the center of rotation of the 
crane to the center of gravity of the load 
What applies to...
When making a multiple crane lift, it is important for the operator to understand that: - The 
weight may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the 
load radius will: - Increase 
Most crane manufa...
Preview 2 out of 6 pages
Add to cartWhen making a multiple crane lift, it is important for the operator to understand that: - The 
weight may increase if the other crane lands the load 
If a crane is not set-up level and the operator swings a load from the high side to the low side, the 
load radius will: - Increase 
Most crane manufa...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller Tulloch. Stuvia facilitates payment to the seller.
No, you only buy these notes for $50.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
77254 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now