A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? answerDiam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot re...
Preview 3 out of 16 pages
Add to cartElevator Mechanic Exam Review 
 
A contractor wants to raise the car speed from 100fpm to 125fpm, it currently has a 12" sheave. What sheave is required? answerDiam=12" 12/4=3" 25fpm=3" 100fpm + 25fpm= 12"+3"= 15" sheave 
 
A MOV (Metal Oxide Varistor) burns out. You replace it, but cannot re...
Elevator Mechanic Study 278 
Elevator Mechanic Study 278 
 
Its a box with shaded triangle in lower right hand corner. answer- Which relay do you need to Order 
 
710 Pg, 7 
 
RPM = 60 ∙ ƒ ÷ P÷2 = 
Step 1. 60 x Frequency (Hz.) = 
Step 2. Poles ÷ 2 = 
Take answer 1 and ÷ by answer 2 = answer-...
Preview 4 out of 32 pages
Add to cartElevator Mechanic Study 278 
Elevator Mechanic Study 278 
 
Its a box with shaded triangle in lower right hand corner. answer- Which relay do you need to Order 
 
710 Pg, 7 
 
RPM = 60 ∙ ƒ ÷ P÷2 = 
Step 1. 60 x Frequency (Hz.) = 
Step 2. Poles ÷ 2 = 
Take answer 1 and ÷ by answer 2 = answer-...
Elevator Mechanic Exam 2018 
 
A Latching relay: Used for call registration,direction selection or as selector relays 
Two types are: Set/Rest are electrical and Mechanical Latching relays 
Need to know latching relay symbol, Its a box with shaded triangle in lower right hand corner. answer- Which ...
Preview 3 out of 28 pages
Add to cartElevator Mechanic Exam 2018 
 
A Latching relay: Used for call registration,direction selection or as selector relays 
Two types are: Set/Rest are electrical and Mechanical Latching relays 
Need to know latching relay symbol, Its a box with shaded triangle in lower right hand corner. answer- Which ...
Final Exam Elevator 
 
wrench used for rail installation ANS- spud wrench 
 
The minimum clearance form the floor to the suspended ceiling is: 
a. 80" 
b. 96" 
c. 7'3" 
d. 8'2" ANS- a. 80" 
 
what should you be aware of when removing a cab for replacement? 
a. The weight that is to be removed...
Preview 3 out of 19 pages
Add to cartFinal Exam Elevator 
 
wrench used for rail installation ANS- spud wrench 
 
The minimum clearance form the floor to the suspended ceiling is: 
a. 80" 
b. 96" 
c. 7'3" 
d. 8'2" ANS- a. 80" 
 
what should you be aware of when removing a cab for replacement? 
a. The weight that is to be removed...
Ma State Elevator Exam 
 
What is the minimum height of a landing door? ANSWER- 6' 6" 
 
84.1 17.07 (2) 
 
What is the minimum size of a vent in a hoistway? ANSWER- 3 1/2% of the area of the hoistway or 3 square. Whichever is greater. 
 
80 17.03 (3) 
 
What is the minimum length of a babitted soc...
Preview 2 out of 11 pages
Add to cartMa State Elevator Exam 
 
What is the minimum height of a landing door? ANSWER- 6' 6" 
 
84.1 17.07 (2) 
 
What is the minimum size of a vent in a hoistway? ANSWER- 3 1/2% of the area of the hoistway or 3 square. Whichever is greater. 
 
80 17.03 (3) 
 
What is the minimum length of a babitted soc...
ELEVATORS ( MECHANICAL EQUIPMENT) 
 
Two types of Elevators ans-Electric & Hydraulic 
 
Electric Elevator ans-Cables, tall buildings, DC motor operated 
Requires electrical room 
 
Hydraulic Elevator ans-Plunger, antennaeic, movable rod 
5 - 10 storeys 
 
Elevator Traction Machines ans-Gearless & Ge...
Preview 1 out of 2 pages
Add to cartELEVATORS ( MECHANICAL EQUIPMENT) 
 
Two types of Elevators ans-Electric & Hydraulic 
 
Electric Elevator ans-Cables, tall buildings, DC motor operated 
Requires electrical room 
 
Hydraulic Elevator ans-Plunger, antennaeic, movable rod 
5 - 10 storeys 
 
Elevator Traction Machines ans-Gearless & Ge...
Elevator Mechanic Test - Section 2 
 
In a modernization they plan on moving the controller 30 feet away which ends up resulting in a voltage drop. What do you do? A) Call electric company for a step-up transformer, B) Use a bigger wire. ANS- B) Use a bigger wire. 
 
Governor trips at 115% of rated ...
Preview 1 out of 4 pages
Add to cartElevator Mechanic Test - Section 2 
 
In a modernization they plan on moving the controller 30 feet away which ends up resulting in a voltage drop. What do you do? A) Call electric company for a step-up transformer, B) Use a bigger wire. ANS- B) Use a bigger wire. 
 
Governor trips at 115% of rated ...
100 elevator final exam 
 
Which of the following is a term used to describe a body harness used in conjunction with a shock absorbing lanyard? ANS-Personal fall arrest system 
 
A mechanic is working on a construction job, and finds the carpenter using a powder activated tool to anchor wall track. ...
Preview 2 out of 10 pages
Add to cart100 elevator final exam 
 
Which of the following is a term used to describe a body harness used in conjunction with a shock absorbing lanyard? ANS-Personal fall arrest system 
 
A mechanic is working on a construction job, and finds the carpenter using a powder activated tool to anchor wall track. ...
Elevator Mechanic 
 
ASME ans- American Society of Mechanical Engineers 
 
DOSH ans- Division of Occupational Safety and Health 
 
LADBS ans- Los Angeles Department of Building and Safety 
 
Alteration made to conveyance shall comply with ASME A17.1-204 Section ans- 8.7 
 
The seismic section of ASM...
Preview 3 out of 22 pages
Add to cartElevator Mechanic 
 
ASME ans- American Society of Mechanical Engineers 
 
DOSH ans- Division of Occupational Safety and Health 
 
LADBS ans- Los Angeles Department of Building and Safety 
 
Alteration made to conveyance shall comply with ASME A17.1-204 Section ans- 8.7 
 
The seismic section of ASM...
Elevator Mechanic Exam Prep 
 
Know the formula for RPM ans- RPM = 60 ∙ ƒ ÷ P÷2 = 
Step 1. 60 x Frequency (Hz.) = 
Step 2. Poles ÷ 2 = 
Take answer 1 and ÷ by answer 2 = 
 
You are using a Temp Run Box and you get shocked! Why! 
 
520 Pg. 4 ans- Bad Ground 
 
Scaffolding, You have 32' of ri...
Preview 2 out of 15 pages
Add to cartElevator Mechanic Exam Prep 
 
Know the formula for RPM ans- RPM = 60 ∙ ƒ ÷ P÷2 = 
Step 1. 60 x Frequency (Hz.) = 
Step 2. Poles ÷ 2 = 
Take answer 1 and ÷ by answer 2 = 
 
You are using a Temp Run Box and you get shocked! Why! 
 
520 Pg. 4 ans- Bad Ground 
 
Scaffolding, You have 32' of ri...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller TOPSCORE100. Stuvia facilitates payment to the seller.
No, you only buy these notes for $30.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
75323 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now