[Show more]What type of fixture can arn EPA's WaterSense label? 
 
-Washing machine 
-HET dual flush toilet 
-Dishwasher 
-Kitchen sink faucets - Answer HET dual flush toilet 
 
Which of the following is a strategy to prevent stormwater runoff? 
 
-Installing a vegetated roof 
-Locating the building 40 feet...
Preview 3 out of 23 pages
Add to cartWhat type of fixture can arn EPA's WaterSense label? 
 
-Washing machine 
-HET dual flush toilet 
-Dishwasher 
-Kitchen sink faucets - Answer HET dual flush toilet 
 
Which of the following is a strategy to prevent stormwater runoff? 
 
-Installing a vegetated roof 
-Locating the building 40 feet...
Which LEED rating system has pre-certification? 
 
 
 A. LEED BD+C: Schools 
 B. LEED O+M: Existing Buildings 
 C. LEED ID+C: Commercial Interiors 
 D. LEED BD+C: New Construction 
 E. LEED BD+C: Core and Shell - Answer E. LEED BD+C: Core and Shell 
 
'Once a project is registered as a LEED BD+C:...
Preview 4 out of 36 pages
Add to cartWhich LEED rating system has pre-certification? 
 
 
 A. LEED BD+C: Schools 
 B. LEED O+M: Existing Buildings 
 C. LEED ID+C: Commercial Interiors 
 D. LEED BD+C: New Construction 
 E. LEED BD+C: Core and Shell - Answer E. LEED BD+C: Core and Shell 
 
'Once a project is registered as a LEED BD+C:...
LEED Stands for - Answer Leadership in Energy and Environmental Design 
 
How many credential types for LEED AP Specialty are available? - Answer (5) 
 
LEED projects are certified, while LEED professionals are ________. - Answer Accredited 
 
LEED Fellows - Answer Highest level of credentia...
Preview 2 out of 10 pages
Add to cartLEED Stands for - Answer Leadership in Energy and Environmental Design 
 
How many credential types for LEED AP Specialty are available? - Answer (5) 
 
LEED projects are certified, while LEED professionals are ________. - Answer Accredited 
 
LEED Fellows - Answer Highest level of credentia...
At a minimum, a project team must successfully do which of the following to obtain LEED certification? - Answer Gather documentation for the prerequisites 
Projects must meet all prerequisites to earn LEED certification and submit documentation for the credits being attempted. 
 
Gather documentat...
Preview 2 out of 12 pages
Add to cartAt a minimum, a project team must successfully do which of the following to obtain LEED certification? - Answer Gather documentation for the prerequisites 
Projects must meet all prerequisites to earn LEED certification and submit documentation for the credits being attempted. 
 
Gather documentat...
What best defines the property area? - Answer Total area within the legal property boundaries of the site; it encompasses all areas of the site, including constructed and non-constructed areas 
The property boundary and/or property area is the total area within the legal property boundaries of the...
Preview 4 out of 39 pages
Add to cartWhat best defines the property area? - Answer Total area within the legal property boundaries of the site; it encompasses all areas of the site, including constructed and non-constructed areas 
The property boundary and/or property area is the total area within the legal property boundaries of the...
What are the Minimum Program Requirements for a LEED project? - Answer 1. Must be in a permanent location on existing land. 
2. Must use a reasonable site boundary. 
3. Must comply with the project size requirements. 
 
What is ASHRAE 62.1 related to? - Answer ASHRAE 62.1 is related to ventila...
Preview 4 out of 93 pages
Add to cartWhat are the Minimum Program Requirements for a LEED project? - Answer 1. Must be in a permanent location on existing land. 
2. Must use a reasonable site boundary. 
3. Must comply with the project size requirements. 
 
What is ASHRAE 62.1 related to? - Answer ASHRAE 62.1 is related to ventila...
What materials qualify as "biobased" in LEED v4? - Answer Materials meeting the criteria of the Sustainable Agriculture Standard. 
In LEED v4 Biobased materials are no longer defined by the harvest cycle of the raw materials; instead, products must meet the Sustainable Agriculture Standard to c...
Preview 2 out of 5 pages
Add to cartWhat materials qualify as "biobased" in LEED v4? - Answer Materials meeting the criteria of the Sustainable Agriculture Standard. 
In LEED v4 Biobased materials are no longer defined by the harvest cycle of the raw materials; instead, products must meet the Sustainable Agriculture Standard to c...
What does LEED stand for? - Answer LEED, or Leadership in Energy & Environmental Design, is a green building certification program that recognizes best-in-class building strategies and practices. 
 
How do you receive LEED Certification? - Answer To receive LEED certification, building projects ...
Preview 1 out of 3 pages
Add to cartWhat does LEED stand for? - Answer LEED, or Leadership in Energy & Environmental Design, is a green building certification program that recognizes best-in-class building strategies and practices. 
 
How do you receive LEED Certification? - Answer To receive LEED certification, building projects ...
List the credit categories - Answer Integrative approach 
sustainable sites 
water efficiency 
energy and atmosphere 
indoor air quality 
location and transportation 
material and resources 
innnovation 
regional priority 
 
LEED's system goals are referred to as ________ - Answer Impact Cate...
Preview 2 out of 9 pages
Add to cartList the credit categories - Answer Integrative approach 
sustainable sites 
water efficiency 
energy and atmosphere 
indoor air quality 
location and transportation 
material and resources 
innnovation 
regional priority 
 
LEED's system goals are referred to as ________ - Answer Impact Cate...
What rating system has a credit category named Smart Location and Linkage? - Answer LEED ND 
 
What is the proper designation for a project that has earned 80 points and met all prerequisites? - Answer LEED Platinum 
 
LEED requires which of the following to be done in order for a project to ear...
Preview 2 out of 13 pages
Add to cartWhat rating system has a credit category named Smart Location and Linkage? - Answer LEED ND 
 
What is the proper designation for a project that has earned 80 points and met all prerequisites? - Answer LEED Platinum 
 
LEED requires which of the following to be done in order for a project to ear...
The integrative process should be started: 
a) b/w the design + construction phase 
b) after the design process begins 
c)before the design process begins 
d) as soon as the project team is assembled regardless of what stage design is in 
e) after the bidding process is complete - Answer c) befo...
Preview 3 out of 20 pages
Add to cartThe integrative process should be started: 
a) b/w the design + construction phase 
b) after the design process begins 
c)before the design process begins 
d) as soon as the project team is assembled regardless of what stage design is in 
e) after the bidding process is complete - Answer c) befo...
Aeroponics - Answer The process of growing plants in suspension in an air or mist environment without the use of soil 
 
Biogas - Answer An alternative fuel that is generated from decomposing organic matter, such as food and animal waste, which is processed in an anaerobic digester 
 
Carbon Mon...
Preview 4 out of 53 pages
Add to cartAeroponics - Answer The process of growing plants in suspension in an air or mist environment without the use of soil 
 
Biogas - Answer An alternative fuel that is generated from decomposing organic matter, such as food and animal waste, which is processed in an anaerobic digester 
 
Carbon Mon...
aeroponics - Answer The process of growing plants in suspension in an air or mist environment without the use of soil 
 
use of water mist to provide the plants' roots with nutrients 
 
gardens without a soil system 
 
biogas - Answer an alternative fuel generated from decomposing organic matte...
Preview 3 out of 26 pages
Add to cartaeroponics - Answer The process of growing plants in suspension in an air or mist environment without the use of soil 
 
use of water mist to provide the plants' roots with nutrients 
 
gardens without a soil system 
 
biogas - Answer an alternative fuel generated from decomposing organic matte...
What rules should be used when selecting a LEED rating system when more than one system may apply? - Answer 40/60 
Use the rating system that is most applicable 
 
To verify the compliance of a credit or prerequisite, a qualified member of the project team submits this - Answer Credit Forms 
 
T...
Preview 2 out of 11 pages
Add to cartWhat rules should be used when selecting a LEED rating system when more than one system may apply? - Answer 40/60 
Use the rating system that is most applicable 
 
To verify the compliance of a credit or prerequisite, a qualified member of the project team submits this - Answer Credit Forms 
 
T...
How many types of credentials for LEED AP with Specialty are available? (Choose 1) 
 
A. 5 
B. 6 
C. 3 
D. 4 
E. 2 - Answer A 
 
Is it possible to site for the LEED Green Associate exam and the LEED AP ID+C exam in one day? 
 
A. Yes 
B. No - Answer A 
 
Is LEED project experience needed in orde...
Preview 4 out of 43 pages
Add to cartHow many types of credentials for LEED AP with Specialty are available? (Choose 1) 
 
A. 5 
B. 6 
C. 3 
D. 4 
E. 2 - Answer A 
 
Is it possible to site for the LEED Green Associate exam and the LEED AP ID+C exam in one day? 
 
A. Yes 
B. No - Answer A 
 
Is LEED project experience needed in orde...
Biodegradable - Answer Capable of decomposing under natural conditions. 
 
Carbon Footprint - Answer A measure of greenhouse gas emissions associated with an activity. 
 
Ecosystem - Answer A basic unit of nature that includes a community of organisms and their nonliving environment linked by ...
Preview 3 out of 30 pages
Add to cartBiodegradable - Answer Capable of decomposing under natural conditions. 
 
Carbon Footprint - Answer A measure of greenhouse gas emissions associated with an activity. 
 
Ecosystem - Answer A basic unit of nature that includes a community of organisms and their nonliving environment linked by ...
What constitutes the largest use of energy in buildings in the US? - Answer Space Heating 
 
Green building emphasizes using what type of design process? - Answer Integrative 
 
What are the three dimensions of sustainability often described as the triple bottom line or the three-legged stool? -...
Preview 3 out of 19 pages
Add to cartWhat constitutes the largest use of energy in buildings in the US? - Answer Space Heating 
 
Green building emphasizes using what type of design process? - Answer Integrative 
 
What are the three dimensions of sustainability often described as the triple bottom line or the three-legged stool? -...
40/60 rule - Answer A method used to choose the appropriate rating system for the project if the project seems to fit under multiple rating systems. 
 
Active daylighting - Answer Is a system that tracks and collects the sunlight using mechanical devices, but they may not function well on cloudy...
Preview 3 out of 21 pages
Add to cart40/60 rule - Answer A method used to choose the appropriate rating system for the project if the project seems to fit under multiple rating systems. 
 
Active daylighting - Answer Is a system that tracks and collects the sunlight using mechanical devices, but they may not function well on cloudy...
LEED Green Associate Exam|100 questions with correct answers
Preview 3 out of 21 pages
Add to cartLEED Green Associate Exam|100 questions with correct answers
What does USGBC stand for? - Answer U. S. Green Building Council 
 
What does LEED stand for? - Answer Leadership in Energy and Environmental 
Design 
 
What code has been developed to overlay existing, traditional building codes? - Answer International Green Construction Code 
(IGCC) 
 
What ...
Preview 3 out of 24 pages
Add to cartWhat does USGBC stand for? - Answer U. S. Green Building Council 
 
What does LEED stand for? - Answer Leadership in Energy and Environmental 
Design 
 
What code has been developed to overlay existing, traditional building codes? - Answer International Green Construction Code 
(IGCC) 
 
What ...
Who can use the USGMC Member Logo? - Answer Only USGBC Members in good standing. 
 
What can be used to assist with the certification of projects in a campus of multi-building setting such as corporate campuses, college campuses and government installations? - Answer ** The LEED for Multiple Bui...
Preview 4 out of 188 pages
Add to cartWho can use the USGMC Member Logo? - Answer Only USGBC Members in good standing. 
 
What can be used to assist with the certification of projects in a campus of multi-building setting such as corporate campuses, college campuses and government installations? - Answer ** The LEED for Multiple Bui...
cradle to grave - Answer Open system where materials are extracted, manufactured, purchased, consumed, and disposed of, with a clear beginning and finite end. Linear consumption to waste process. 
 
cradle to cradle - Answer Closed system where materials are reused at the end of their useful lif...
Preview 3 out of 29 pages
Add to cartcradle to grave - Answer Open system where materials are extracted, manufactured, purchased, consumed, and disposed of, with a clear beginning and finite end. Linear consumption to waste process. 
 
cradle to cradle - Answer Closed system where materials are reused at the end of their useful lif...
LEED Addenda - Answer If an error is found in the LEED rating system, which of the following would USGBC use to address the error? 
 
1. It is market-driven; 2. It is government-financed; 3. It is consensus-based - Answer What are three important factors of LEED Green Building Rating System? 
 
1....
Preview 2 out of 13 pages
Add to cartLEED Addenda - Answer If an error is found in the LEED rating system, which of the following would USGBC use to address the error? 
 
1. It is market-driven; 2. It is government-financed; 3. It is consensus-based - Answer What are three important factors of LEED Green Building Rating System? 
 
1....
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller BillRanker. Stuvia facilitates payment to the seller.
No, you only buy these notes for $42.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
64438 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now