Add to cartWhat are the five phases of commissioning? - ️️1.) Pre-Design 
2.) Design 
3.) Construction 
4.) Acceptance 
5.) Post-Acceptance 
 
Studies indicate _ to _% savings in building operating costs when comparing a comissioned building to a non-commissioned building. - ️️8 to 20% 
 
What is commi...
Preview 2 out of 15 pages
Add to cartWhat are the five phases of commissioning? - ️️1.) Pre-Design 
2.) Design 
3.) Construction 
4.) Acceptance 
5.) Post-Acceptance 
 
Studies indicate _ to _% savings in building operating costs when comparing a comissioned building to a non-commissioned building. - ️️8 to 20% 
 
What is commi...
Affordance Decomposition - ️️The isolation of the specific functions, meanings, limitations, and challenges that can be provided by a given technology or capability. 
 
Application service provider (ASP) - ️️A business that provides computer-based services to customers over the internet. Thi...
Preview 2 out of 10 pages
Add to cartAffordance Decomposition - ️️The isolation of the specific functions, meanings, limitations, and challenges that can be provided by a given technology or capability. 
 
Application service provider (ASP) - ️️A business that provides computer-based services to customers over the internet. Thi...
1. Owner 
2. End user 
3. architect 
4. electrical engineer 
5. mechanical engineer 
6. commissioning authority 
7. controls contractor 
8. mechanical contractor 
9. electrical contractor 
10. sheet metal contractor 
11. TAB agency 
12. General or construction manager 
13. owners O&M staff - ️️I...
Preview 2 out of 7 pages
Add to cart1. Owner 
2. End user 
3. architect 
4. electrical engineer 
5. mechanical engineer 
6. commissioning authority 
7. controls contractor 
8. mechanical contractor 
9. electrical contractor 
10. sheet metal contractor 
11. TAB agency 
12. General or construction manager 
13. owners O&M staff - ️️I...
Who is responsible for Pre-Deisgn Phase Document Control - ️️CxA 
 
Who is responsible for Pre-Deisgn Phase Develop Cx Scope - ️️CxA 
 
Who is responsible for Pre-Deisgn Phase Review DID/OPR - ️️CxA 
 
Who is responsible for Pre-Deisgn Phase Prepare Cx Outline - ️️CxA 
 
Who is respo...
Preview 2 out of 7 pages
Add to cartWho is responsible for Pre-Deisgn Phase Document Control - ️️CxA 
 
Who is responsible for Pre-Deisgn Phase Develop Cx Scope - ️️CxA 
 
Who is responsible for Pre-Deisgn Phase Review DID/OPR - ️️CxA 
 
Who is responsible for Pre-Deisgn Phase Prepare Cx Outline - ️️CxA 
 
Who is respo...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller jackline98. Stuvia facilitates payment to the seller.
No, you only buy these notes for $15.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
62890 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now