Package deal
Stationary Engineer Combined Sets
Stationary Engineer Combined Sets
[Show more]Stationary Engineer Combined Sets
[Show more]Stationary Steam Engineer License 
Prep {3 
rd Class} Pre Test Questions 
And Answers 
_________ are necessary for complete combustion - ANSWER : 
time, temperature, mixture, and atomization 
If the steam pressure gauge indicates 200 PSIG, the absolute 
pressure is______ - ANSWER : 214.7 
A boil...
Preview 3 out of 24 pages
Add to cartStationary Steam Engineer License 
Prep {3 
rd Class} Pre Test Questions 
And Answers 
_________ are necessary for complete combustion - ANSWER : 
time, temperature, mixture, and atomization 
If the steam pressure gauge indicates 200 PSIG, the absolute 
pressure is______ - ANSWER : 214.7 
A boil...
Stationary Engineer Local 99 
Test Questions And Revised 
Correct Answers 
In a reciprocating feedwater pump, the _______________ 
A. water piston is larger than the steam piston 
B. water and steam piston are the same size 
C. steam piston is larger than the water piston 
D. steam valve has to be ...
Preview 4 out of 50 pages
Add to cartStationary Engineer Local 99 
Test Questions And Revised 
Correct Answers 
In a reciprocating feedwater pump, the _______________ 
A. water piston is larger than the steam piston 
B. water and steam piston are the same size 
C. steam piston is larger than the water piston 
D. steam valve has to be ...
Stationary Engineer Electric Test 
Questions And Correct Answers 
An AC circuit consists only of a pure inductance and a power 
source. The relationship between the voltage and the current in 
this circuit is that the - ANSWER : current lags the voltage 
The power factor of a load is equal to the...
Preview 4 out of 44 pages
Add to cartStationary Engineer Electric Test 
Questions And Correct Answers 
An AC circuit consists only of a pure inductance and a power 
source. The relationship between the voltage and the current in 
this circuit is that the - ANSWER : current lags the voltage 
The power factor of a load is equal to the...
UpStationary Grade 3 Engineering 
License Pre Test Questions And 
Correct Answers 
How can you loose your license? - CORRECT ANS : 1) drinking on the job 
2) sleeping on the job 
3) negligence 
4) unsafe work 
5) signing a falsified license application for someone 
6) failing to renew your licens...
Preview 4 out of 53 pages
Add to cartUpStationary Grade 3 Engineering 
License Pre Test Questions And 
Correct Answers 
How can you loose your license? - CORRECT ANS : 1) drinking on the job 
2) sleeping on the job 
3) negligence 
4) unsafe work 
5) signing a falsified license application for someone 
6) failing to renew your licens...
Engineers License Study Guide 
Questions And Revised Correct 
Answers 
What winding is connected to the load? - ANSWER : secondary 
Regulates the steam pressure? - ANSWER : Modulating 
pressure control 
When can you blow down a water wall? - ANSWER : when there 
is no pressure on the boiler 
What...
Preview 2 out of 12 pages
Add to cartEngineers License Study Guide 
Questions And Revised Correct 
Answers 
What winding is connected to the load? - ANSWER : secondary 
Regulates the steam pressure? - ANSWER : Modulating 
pressure control 
When can you blow down a water wall? - ANSWER : when there 
is no pressure on the boiler 
What...
Engineer License Exam Prep 
Questions And Revised Correct 
Answers 
A ______ fuse is necessary for a circuit with a load of 21,000 watts and a voltage 
of 220 volts. 
A. 100 
B. 150 
C. 175 
D. 200 
A. 100 amps. Note: V = IR Therefore I = V/R 21,000 amps /220 volts = 95 amps 
At 0 psig, how many B...
Preview 4 out of 52 pages
Add to cartEngineer License Exam Prep 
Questions And Revised Correct 
Answers 
A ______ fuse is necessary for a circuit with a load of 21,000 watts and a voltage 
of 220 volts. 
A. 100 
B. 150 
C. 175 
D. 200 
A. 100 amps. Note: V = IR Therefore I = V/R 21,000 amps /220 volts = 95 amps 
At 0 psig, how many B...
MD Stationary Engineer Questions 
And Answers 
Gases of Combustion that cool on Contact with the boiler heating 
Surface before combushion is completed Cause a(n) _________ - 
CORRECT ANS : Formation of soot and smoke 
In the event of a flame failure, the programmer will______ - 
CORRECT ANS : Sec...
Preview 2 out of 5 pages
Add to cartMD Stationary Engineer Questions 
And Answers 
Gases of Combustion that cool on Contact with the boiler heating 
Surface before combushion is completed Cause a(n) _________ - 
CORRECT ANS : Formation of soot and smoke 
In the event of a flame failure, the programmer will______ - 
CORRECT ANS : Sec...
Stationary Engineer Test Set 
Questions And Answers 
How much clearance from the top of the boiler is needed 
for a HP boiler that produces 70000 lbs of steam? - 
ANSWER : 7 feet 
On a gas fired boiler what is the proper gas to air mixture 
- ANSWER : 30%-70% and in special arrangements it can ...
Preview 4 out of 73 pages
Add to cartStationary Engineer Test Set 
Questions And Answers 
How much clearance from the top of the boiler is needed 
for a HP boiler that produces 70000 lbs of steam? - 
ANSWER : 7 feet 
On a gas fired boiler what is the proper gas to air mixture 
- ANSWER : 30%-70% and in special arrangements it can ...
Stationary Engineering Pre Test 
Questions And Answers 
What are drum internals? - ANSWER : Drums internals 
comprise all apparatus with in a drum, including all baffles 
that quiet or separate the steam and water, the various 
devices that may be used for affecting the separation of 
the steam...
Preview 2 out of 9 pages
Add to cartStationary Engineering Pre Test 
Questions And Answers 
What are drum internals? - ANSWER : Drums internals 
comprise all apparatus with in a drum, including all baffles 
that quiet or separate the steam and water, the various 
devices that may be used for affecting the separation of 
the steam...
Stationary Engineer Vocabulary 
Pre Test Questions And Answers 
Accumulation test - CORRECT ANS : test used 
to establish the relieving capacity of boiler 
safety valves 
Air atomizing burner - CORRECT ANS : insidemixing fuel oil burner that uses compressed air 
from an air compressor for atomiz...
Preview 3 out of 20 pages
Add to cartStationary Engineer Vocabulary 
Pre Test Questions And Answers 
Accumulation test - CORRECT ANS : test used 
to establish the relieving capacity of boiler 
safety valves 
Air atomizing burner - CORRECT ANS : insidemixing fuel oil burner that uses compressed air 
from an air compressor for atomiz...
Stationary Engineer Electric Pre 
Test Questions And Answers 
An AC circuit consists only of a pure inductance and a power source. The relationship 
between the voltage and the current in this circuit is that the - ANSWER : current lags 
the voltage 
The power factor of a load is equal to the ___...
Preview 3 out of 28 pages
Add to cartStationary Engineer Electric Pre 
Test Questions And Answers 
An AC circuit consists only of a pure inductance and a power source. The relationship 
between the voltage and the current in this circuit is that the - ANSWER : current lags 
the voltage 
The power factor of a load is equal to the ___...
Stationary Engineer Electric Pre 
Test Questions And Answers 
An AC circuit consists only of a pure inductance and a power source. The relationship 
between the voltage and the current in this circuit is that the - ANSWER : current lags 
the voltage 
The power factor of a load is equal to the ___...
Preview 3 out of 28 pages
Add to cartStationary Engineer Electric Pre 
Test Questions And Answers 
An AC circuit consists only of a pure inductance and a power source. The relationship 
between the voltage and the current in this circuit is that the - ANSWER : current lags 
the voltage 
The power factor of a load is equal to the ___...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller EWLindy. Stuvia facilitates payment to the seller.
No, you only buy these notes for $45.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
67096 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now