You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a 
large loss of load in the contingent BA. If your generator governor control systems responded to the 
frequency deviation approximately how mu...
Preview 2 out of 12 pages
Add to cartNERC book quiz| 157 questions| WITH COMPLETE 
SOLUTIONS 
You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a 
large loss of load in the contingent BA. If your generator governor control systems responded to the 
frequency deviation approximately how mu...
NERC RC Exam 2024 with complete solutions 
Common standard time period for station battery to handle outage of AC power to chargers - Answer -8- 
12 hours 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed 
unsuccessful - Answer -2 hours 
Transition period to backu...
Preview 2 out of 6 pages
Add to cartNERC RC Exam 2024 with complete solutions 
Common standard time period for station battery to handle outage of AC power to chargers - Answer -8- 
12 hours 
Time to restore data exchange redundancy when redundancy testing by RC/TOP/BA deemed 
unsuccessful - Answer -2 hours 
Transition period to backu...
NERC PREP TEST 101 2024 | 200 QUESTIONS| WITH 
COMPLETE SOLUTIONS 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 
MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors woul...
Preview 4 out of 61 pages
Add to cartNERC PREP TEST 101 2024 | 200 QUESTIONS| WITH 
COMPLETE SOLUTIONS 
1. If a 500 kV transmission line with a surge impedance loading of 800 MW is currently loaded at 1400 
MW, which of the following events would most likely occur? 
a. Generator MVAR output would increase 
b. All system capacitors woul...
SOS NERC Prep - RElIABILITY Exam 2024 WITH 
COMPLETE SOLUTIONS 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top 
of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency 
Bias Setting is -100 MW/.1Hz....
Preview 4 out of 76 pages
Add to cartSOS NERC Prep - RElIABILITY Exam 2024 WITH 
COMPLETE SOLUTIONS 
The Reliability Coordinator just informed you of a slow time error correction which will begin at the top 
of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency 
Bias Setting is -100 MW/.1Hz....
Practice Test NERC 2024 WITH COMPLETE 
SOLUTIONS 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending 
Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle 
difference will be? - Answer -The phase an...
Preview 3 out of 17 pages
Add to cartPractice Test NERC 2024 WITH COMPLETE 
SOLUTIONS 
A transmission line is operating with a voltage phase angle different of 30 degrees between the sending 
Vs and the receiving bus Vr. If the receiving end load is suddenly increased, the voltage phase angle 
difference will be? - Answer -The phase an...
NERC RANDOM Questions AND ANSWERS| 100% 
CORRECT 
When current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
a) half as much 
b) does not change 
c) doubles 
d) four times greater - Answer -d) four times greater 
What determines the size of insulators used on p...
Preview 4 out of 31 pages
Add to cartNERC RANDOM Questions AND ANSWERS| 100% 
CORRECT 
When current in an AC circuit is doubled, power losses in the circuit will respond in which way? 
a) half as much 
b) does not change 
c) doubles 
d) four times greater - Answer -d) four times greater 
What determines the size of insulators used on p...
Final Assessment Correct answers| NERC EXAM 2024 
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly 
integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% - Answer -B. 10% 
Dry stea...
Preview 4 out of 73 pages
Add to cartFinal Assessment Correct answers| NERC EXAM 2024 
When using a dynamic schedule and the energy profile in an hour is >250 MW and the actual hourly 
integration deviates from the hourly energy profile by ____ the tag must be modified. 
A. 100 MW 
B. 10% 
C. 50 MW 
D. 25% - Answer -B. 10% 
Dry stea...
NERC Test 2024/2025 WITH COMPLETE SOLUTIONS 
What percentage of load gives a 1 Hz change in an island condition? - Answer -6-10% (Think 6-10 day 
island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? - Answer -Nothing! ACE bias and 
interchange schedule will improv...
Preview 2 out of 15 pages
Add to cartNERC Test 2024/2025 WITH COMPLETE SOLUTIONS 
What percentage of load gives a 1 Hz change in an island condition? - Answer -6-10% (Think 6-10 day 
island vacation) 
If ACE is Zero but system Hz is off, what should a system operator do? - Answer -Nothing! ACE bias and 
interchange schedule will improv...
NERC SOS quiz 2024 WITH COMPLETE SOLUTIONS 
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing 
Authority is not permitted to provide which of the following for any other Balancing Authority entities? - 
Answer -Regulation of other services related to contr...
Preview 4 out of 32 pages
Add to cartNERC SOS quiz 2024 WITH COMPLETE SOLUTIONS 
If a Balancing Authority does not comply with the Control Performance Standard, the Balancing 
Authority is not permitted to provide which of the following for any other Balancing Authority entities? - 
Answer -Regulation of other services related to contr...
NERC TOP System Operations 2024 WITH COMPLETE 
SOLUTIONS 
At what torque angle of operation does power typically begin to flow from the generator to the system? 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees - Answer -10 degrees 
Choose the answer that best describes the operation of a ...
Preview 3 out of 19 pages
Add to cartNERC TOP System Operations 2024 WITH COMPLETE 
SOLUTIONS 
At what torque angle of operation does power typically begin to flow from the generator to the system? 
A) 90 degrees 
B) 60 degrees 
C) 30 degrees 
D) 10 degrees - Answer -10 degrees 
Choose the answer that best describes the operation of a ...
Nerc Test 88 QUESTIONS WITH COMPLETE 
SOLUTIONS 
According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is 
less than_________________ - Answer -60 minutes 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within ho...
Preview 2 out of 6 pages
Add to cartNerc Test 88 QUESTIONS WITH COMPLETE 
SOLUTIONS 
According to Nerc Standards, an emergency interchange transaction can be exempt from tagging if it is 
less than_________________ - Answer -60 minutes 
A BA or LSE that requests an EEA 3 must complete and EEA 3 report and submit it to the RC within ho...
NERC-CIP v5 Standards 
CIP-002 - Answer -BES Cyber System Categorization 
CIP-003 - Answer -Security Management Controls 
CIP-004 - Answer -Personnel and Training 
CIP-005 - Answer -Electronic Security Perimeter 
CIP-006 - Answer -Physical Security of BES Cyber Systems 
CIP-007 - Answer -System Secu...
Preview 1 out of 2 pages
Add to cartNERC-CIP v5 Standards 
CIP-002 - Answer -BES Cyber System Categorization 
CIP-003 - Answer -Security Management Controls 
CIP-004 - Answer -Personnel and Training 
CIP-005 - Answer -Electronic Security Perimeter 
CIP-006 - Answer -Physical Security of BES Cyber Systems 
CIP-007 - Answer -System Secu...
NERC Flashcards WITH COMPLETE SOLUTIONS 
EDE - Answer -Energy Deficient Entity 
Ime - Answer -meter error 
DCS - Answer -Disturbance Control Standard 
DFRs - Answer -Digital Fault Recorder 
LOFT - Answer -Linear on the fly testing 
SCADA - Answer -Supervisory Control and Data Acquisition 
EMS - Answ...
Preview 1 out of 4 pages
Add to cartNERC Flashcards WITH COMPLETE SOLUTIONS 
EDE - Answer -Energy Deficient Entity 
Ime - Answer -meter error 
DCS - Answer -Disturbance Control Standard 
DFRs - Answer -Digital Fault Recorder 
LOFT - Answer -Linear on the fly testing 
SCADA - Answer -Supervisory Control and Data Acquisition 
EMS - Answ...
NERC RC TEST WITH COMPLETE SOLUTIONS 
System studies identify what - Answer -Predict operations and identify constraints 
If ACE remains the same and frequency goes up what has happened? - Answer -Someone lost load 
When a generator has its AVR in service it is a? - Answer -Dynamic source of reactiv...
Preview 1 out of 4 pages
Add to cartNERC RC TEST WITH COMPLETE SOLUTIONS 
System studies identify what - Answer -Predict operations and identify constraints 
If ACE remains the same and frequency goes up what has happened? - Answer -Someone lost load 
When a generator has its AVR in service it is a? - Answer -Dynamic source of reactiv...
NERC text 130 with complete solutions 
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - Answer -D. Interruptible loads 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complyi...
Preview 3 out of 30 pages
Add to cartNERC text 130 with complete solutions 
Operating reserve may be provided by which of the following? 
A. LTCs 
B. Capacitor banks 
C. Voltage regulators 
D. Interruptible loads - Answer -D. Interruptible loads 
Which of the following is the responsibility of a reserve sharing group (RSG)? 
A. Complyi...
NERC Reliability Standard numbers and titles 
BAL-001-0.1a - Answer -Real Power Balancing Control Performance 
BAL-STD-002-0 - Answer -Operating Reserves (WECC) 
BAL-003-0.1b - Answer -Frequency Response and Bias 
BAL-004-0 - Answer -Time Error Correction 
BAL-004-WECC-01 - Answer -Automatic Time Er...
Preview 2 out of 6 pages
Add to cartNERC Reliability Standard numbers and titles 
BAL-001-0.1a - Answer -Real Power Balancing Control Performance 
BAL-STD-002-0 - Answer -Operating Reserves (WECC) 
BAL-003-0.1b - Answer -Frequency Response and Bias 
BAL-004-0 - Answer -Time Error Correction 
BAL-004-WECC-01 - Answer -Automatic Time Er...
NERC flashcard set Reliability coordinator (RC) 2024 
What entity balances generation and monitors/employs contingency reserves? - Answer -Balancing 
Authority (BA) 
What entity has the widest system view and is the "supervisor"? - Answer -Reliability coordinator (RC) 
What entity monitors transmi...
Preview 2 out of 15 pages
Add to cartNERC flashcard set Reliability coordinator (RC) 2024 
What entity balances generation and monitors/employs contingency reserves? - Answer -Balancing 
Authority (BA) 
What entity has the widest system view and is the "supervisor"? - Answer -Reliability coordinator (RC) 
What entity monitors transmi...
NERC Class with complete solutions 
Frequency Bias and Jointly Owned Units (JOU) - Answer -BAs that use dynamic schedule or pseudo-ties 
for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their b...
Preview 2 out of 11 pages
Add to cartNERC Class with complete solutions 
Frequency Bias and Jointly Owned Units (JOU) - Answer -BAs that use dynamic schedule or pseudo-ties 
for a jointly owned unit share responsibility for it in their bias settings. 
Fixed schedules for JOU require host BA to include total response for them in their b...
NERC Standards with complete solutions 
How Many Active Standards are in BAL (Resource and Demand Balancing) - Answer -There are 8 Active 
Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement 
BAL-001-TRE-1 Primary Frequency Response ...
Preview 2 out of 12 pages
Add to cartNERC Standards with complete solutions 
How Many Active Standards are in BAL (Resource and Demand Balancing) - Answer -There are 8 Active 
Standards Listed Below: 
BAL-001-2 Real Power Balancing Control Performance Related Information Subject to Enforcement 
BAL-001-TRE-1 Primary Frequency Response ...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller AdelineJean. Stuvia facilitates payment to the seller.
No, you only buy these notes for $14.19. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
80461 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now