Package deal
ACI Written Exam Questions & 100% Verified Answers Pack | Latest Update
ACI Written Exam Questions & 100% Verified Answers Pack | Latest Update
[Show more]ACI Written Exam Questions & 100% Verified Answers Pack | Latest Update
[Show more]The Method of determining air content of concrete containing lightweight aggregate is 
the pressure method. True or False ☑: False 
When making a test cylinder from concrete being used in construction, the field 
technician must also measure the slump of the concrete. ☑: True 
While the techni...
Preview 2 out of 5 pages
Add to cartThe Method of determining air content of concrete containing lightweight aggregate is 
the pressure method. True or False ☑: False 
When making a test cylinder from concrete being used in construction, the field 
technician must also measure the slump of the concrete. ☑: True 
While the techni...
the pressure method ☑: False. Relatively dense 
Is the following statement true or false? When making a test cylinder from concrete 
being used in construction, the field technician must also measure the slump of the 
concrete. ☑: True 
While the technician is checking the slump of the concret...
Preview 1 out of 4 pages
Add to cartthe pressure method ☑: False. Relatively dense 
Is the following statement true or false? When making a test cylinder from concrete 
being used in construction, the field technician must also measure the slump of the 
concrete. ☑: True 
While the technician is checking the slump of the concret...
The sensor of the temperature measureing device shall be submerged a minimum of 
____ in ☑: 3 (75mm) 
The temperature measureing device shall have a capacity of measuring temperature of 
freshly mixed conrcrete to +-_____ degrees F throught a range of _____ ☑: 1(.5 degrees C), 30-120 (0-50 deg...
Preview 3 out of 22 pages
Add to cartThe sensor of the temperature measureing device shall be submerged a minimum of 
____ in ☑: 3 (75mm) 
The temperature measureing device shall have a capacity of measuring temperature of 
freshly mixed conrcrete to +-_____ degrees F throught a range of _____ ☑: 1(.5 degrees C), 30-120 (0-50 deg...
The total time allowed between obtaining the first and final portions of a composite 
sample is ☑: 15 minutes 
When it is necessary to wet sieve the concrete sample, wet sieving should be 
performed after the individual samples are remixed into a composite sample (T or F) ☑: F 
Tests for slump...
Preview 2 out of 14 pages
Add to cartThe total time allowed between obtaining the first and final portions of a composite 
sample is ☑: 15 minutes 
When it is necessary to wet sieve the concrete sample, wet sieving should be 
performed after the individual samples are remixed into a composite sample (T or F) ☑: F 
Tests for slump...
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Stuvia is a marketplace, so you are not buying this document from us, but from seller ExamArsenal. Stuvia facilitates payment to the seller.
No, you only buy these notes for $19.49. You're not tied to anything after your purchase.
4.6 stars on Google & Trustpilot (+1000 reviews)
79223 documents were sold in the last 30 days
Founded in 2010, the go-to place to buy study notes for 14 years now