100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACQ 202 Intermediate Systems Acquisition/ ACQ202 all latest 2022 modules tests all already answered and graded. $20.49   Add to cart

Other

ACQ 202 Intermediate Systems Acquisition/ ACQ202 all latest 2022 modules tests all already answered and graded.

 73 views  0 purchase
  • Course
  • Institution

Defense Acquisition University ACQ; ACQ 202_ ACQ 202 Intermediate Systems Acquisition_ All modules, A+ solution guide. ACQ 202 Module 6 Exam: Fielding and Supporting the System ACQ 202 Module 5 Exam: Producing the System ACQ 202 Module 4 Exam: Part II Developing the System ACQ 202 Module 4 Exam...

[Show more]

Preview 4 out of 40  pages

  • March 4, 2022
  • 40
  • 2021/2022
  • Other
  • Unknown
avatar-seller
ACQ 202
MODULE 1 CONSIDERATION OF ALTERNATIVES

contains 10 Questions


1) A software costing method that uses a team of experts working both independently and together to
combine different approaches and arrive at a collective judgment through consensus is an example of
the _________ costing method. [Select an appropriate approach (e.g., Analogy, Parametric, Top-Down,
Engineering (Bottom Up, Actual, Delphi) to estimate the cost and schedule for a software-intensive system.]


Delphi


Top-down

Bottom-up

Parametric



2) An Analysis of Alternatives (AoA) is a study of the __________. [Given an Initial Capabilities Document
(ICD) and a summary Analysis of Alternatives (AoA), select an appropriate concept, from the perspective of the system
developer, to meet the user's requirements.]


Operational effectiveness and life cycle cost of the alternatives

Potential technical solutions

Potential Acquisition Strategies for the alternatives

Cost Analysis for the alternatives


3) The largest amount of cost for a system is related to its operations and support. [Recognize the impact
and interrelationship of life cycle product support and life cycle cost.] [Remediation Accessed :N]

False

True


4) What is a characteristic of a Joint Capabilities Technology Demonstration (JCTD)? [Determine the
applicability of science and technology activities to the acquisition of a system.]

Demonstrates technology in a field environment

Requires no user involvement until after successful completion of the demonstration

Is funded by procurement money set aside specifically for JCTDs.

Is based on a validated requirement which is documented in a Capability Development Document
(CDD).


5) The largest percentage of software life cycle costs is associated with _________? [Relate the typical
distribution of software life cycle costs to the planning of an acquisition program.]

Page 1 of 40

,ACQ 202

Upgrades and Maintenance

Research and Development

Design and Development

Test and Evaluation


6) _______ refers to the cost of procuring prime mission equipment. [Given a cost breakdown, determine
Development Cost, Flyaway Cost, Weapons System Cost, Procurement Cost, Acquisition Cost, and Life Cycle Cost.]

Flyaway Cost

Development Cost

Life Cycle Cost

Weapon System Cost


7) What is the program acquisition cost of this system?
Cost Types Cost(in millions of dollars)
Research, Development, Test & Evaluation $400
Procurement of Prime Mission Equipment $800
Procurement of Support Equipment $100
Procurement of Initial Spares $100
Operations and Support $70,000
Disposal $100
[Given a cost breakdown, determine Development Cost, Flyaway Cost, Weapons System Cost, Procurement Cost, and Life
Cycle Cost.]

$1,400 million

$1,000 million

$1,100 million

$1,500 million


8) The Air Force is in process of completing development on an upgrade to an existing fighter aircraft that
will improve survivability and reliability. The contractor has provided the Government with detailed
technical drawings and associated costs of the parts, materials, and labor required to produce the system.
What cost estimating technique would the Air Force most likely use to prepare their budget estimate for
the upgrade? [Select an appropriate method to estimate the cost of an acquisition program.]

Engineering

Analogy

Parametric

Actual Cost

Page 2 of 40

,ACQ 202

9) Affordability is most concerned with: [Relate the concepts of Affordability and Should Cost to the planning of an
acquisition program.]

Making tradeoffs in performance and schedule to achieve cost objectives within affordability
constraints.

Making tradeoffs that will provide the best possible system in the least amount of time.

Use of commercial design practices to save development and production costs.

Use of state-of-the-art design and materials to accomplish the mission documented in the Initial
Capabilities Document (ICD) and Capability Development Document (CDD).


10) When comparing two alternative concepts, you discover that both will provide the needed capabilities.
Alternative 1 requires new development that will take 7 years and will cost more than the other
alternative. Alternative 2 can be developed in 4 years relying on proven Joint Capabilities Technology
Demonstration (JCTD) technology. Based on the information provided here, which is the better
alternative? [Given a draft Capability Development Document (CDD) and a summary Analysis of Alternatives (AoA),
select an appropriate concept, from the perspective of the system developer, to meet the user's requirements.]

Alternative 2

Alternative 1

contains 1 Questions


1) As a general rule of thumb, __________ of the total ownership costs of a system occur late in the life
cycle, due to costs associated with operations and support. [Recognize the impact and interrelationship of life
cycle product support and life cycle cost.]


70-80%

50-60%

90-95%

30-40%



MODULE 2 PLANNING ACQUISITION STRATEGY DEVELOPMENT (PART I)

contains 20 Questions


1) The Test and Evaluation Master Plan (TEMP) links together, and must be consistent with, which of
the following related program documents (Select all that apply)? [Recognize how the Test and Evaluation
Master Plan (TEMP) generation, staffing and approval process integrates all functional disciplines throughout the
acquisition life cycle.]


Systems Engineering Management Plan (SEMP)


Page 3 of 40

, ACQ 202

Initial Capabilities Document (ICD)

Systems Threat Assessment (STA)

Acquisition Program Baseline (APB)



2) Which one of the following organizations would evaluate measures of effectiveness (MOEs) to
determine how well a munitions system can perform its mission? [Identify the key T&E support organizations
within DoD.]


Marine Corps Operational Test and Evaluation Activity (MCOTEA)

Marine Corps Systems Command (MARCORSYSCOM)

Defense Contract Management Agency (DCMA)

Joint Interoperability Test Command (JITC)


3) Which one of the following test and evaluation (T&E) products is required at Milestone C? [Identify the
primary Test and Evaluation (T&E) products required at each acquisition milestone.]

Operational Assessment (OA) Results

Live Fire Test and Evaluation (LFT&E) Report

Early Operational Assessment (EOA)

DOT&E Report on Initial Operational Test and Evaluation (IOT&E)


4) Operational Measures of Effectiveness (MOE) and Measures of Suitability (MOS) are formally
documented in the ________. [Identify the primary Test and Evaluation (T&E) products required at each acquisition
milestone.] [Remediation Accessed :N]

Test and Evaluation Master Plan (TEMP)

Acquisition Strategy

Initial Capabilities Document (ICD)

Work Breakdown Structure (WBS)


5) Joint Interoperability Test Command (JITC) has primary responsibility for developmental test and
evaluation (T&E) functions throughout DoD. [Identify the requirements for interoperability testing.]

False

True


6) What documentation must be completed prior to a milestone review for a program that will
significantly affect the quality of the environment? [Identify the information required for a milestone review
regarding environmental, safety, and occupational health issues.]
Page 4 of 40

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller dennys. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $20.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77973 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$20.49
  • (0)
  Add to cart