100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
PQM 101 - Production, Quality and Manufacturing Fundamentals $12.49   Add to cart

Exam (elaborations)

PQM 101 - Production, Quality and Manufacturing Fundamentals

 0 view  0 purchase
  • Course
  • Institution

Identify the item that is not a characteristic of a mature process. Correct answer- The process requires further process engineering improvements. Establishing manufacturing capabilities focuses on Correct answer- manufacturing process planning and production resource planning. Producibility En...

[Show more]

Preview 2 out of 13  pages

  • April 21, 2022
  • 13
  • 2021/2022
  • Exam (elaborations)
  • Questions & answers
avatar-seller
PQM 101 - Production, Quality and
Manufacturing Fundamentals

Identify the item that is not a characteristic of a mature process. Correct answer- The
process requires further process engineering improvements.

Establishing manufacturing capabilities focuses on Correct answer- manufacturing
process planning and production resource planning.

Producibility Engineering and Planning focuses on key processess and key product
characteristics as well as: Correct answer- Identifying any new processes or materials
as soon as possible and planning development concurrently with the product design.

Integrated Management Planning (IMP) is __________________. Correct answer- the
merging of manufacturing and production planning and development activities and
quality practices

Four keys to achieving quality are: Correct answer- Quality of design, conformance to
requirements, fitness for use, and cost.

Identify the key element(s) necessary to achieve quality products and services when
performing quality assurance planning. Correct answer- All of the choices apply

Select a manufacturing metric that applies during Production. Correct answer- Process
variance data used to monitor and maintain process capability

What is a group of activities that address process and product design and system
engineering? Correct answer- Manufacturing Engineering

Preparing finished products for shipment to the customer is: Correct answer- Packaging

Which of the following might be considered a key product characteristic of a work boot?
Check all that apply: Correct answer- Sole durability
Sole traction
Steel toe thickness

Verification that the key processes are achieving the key product characteristics is
accomplished by conducting which of the following? Correct answer- Dedicated process
demonstrations

A key step in the control system methodology is: Correct answer- Decide if corrective
action is warranted

, What processes are responsible for achieving key product characteristics? Correct
answer- Key Processes

Which of the following is NOT an example of a material management approach (Push or
Pull system)? Correct answer- DFARS

What measurement is used to judge the quality of incoming material from a particular
supplier? Correct answer- Purchased materials acceptance rate

What is the production control method most often used in industries that process liquid
or gaseous materials? Correct answer- Flow Control

What is a document that lists all of the assemblies, parts, and components that make up
the final product? Correct answer- Bill-of-material

Why are quality systems developed? Correct answer- Because technical specifications
alone do not guarantee that the customer's requirements will be consistently met

A company wants to manufacture a closet door that has the following specifications:
Height: 7'1", Width: 2'6", and Thickness: 1 5/8". Which of the doors below meet the
manufacturer specifications? Correct answer- Height: 7'1", Width: 2'6", and Thickness: 1
5/8"

Which of the following is NOT one of the steps when applying the "Concept of Control
Systems"? Correct answer- Set an arbitrary value

Which process may be used to verify that identified key processes are achieving the
associated key product characteristics? Correct answer- Review of test article
experience and process demonstrations.

What type of Material Management System is "Just-In-Time"? Correct answer- Pull
System

Which of the following describes the DOD policy regarding a contractor's selection and
use of a quality system? Correct answer- Contractors may be allowed to develop their
own quality systems that meet contractual requirements; they are not restricted only to
ISO/ANSI/ASQ 9000 criteria.

What is continuous process improvement? Correct answer- All of the above

What confirms the actions taken to achieve the target? Correct answer- Study Results

What is a quick and easy way for a group to prioritize large lists without creating a
"win/lose" situation? Correct answer- Multi-voting

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller EvaTee. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79400 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart