Which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either Ship's Force or Off-Ship Maintenance Personnel?
Two plus signs
What is the purpose of a Maintenance Requirement Card?
Provide detailed procedures for performing maintena...
which symbol following a periodicity code indicates that the procedure is intended to be scheduled and performed by either ships force or off ship maintenance personnel
Written for
3M LOK
All documents for this subject (1)
Seller
Follow
Arthurmark
Reviews received
Content preview
3M LOK
Which symbol following a periodicity code indicates that the procedure is intended to be
scheduled and performed by either Ship's Force or Off-Ship Maintenance Personnel? -
answerTwo plus signs
What is the purpose of a Maintenance Requirement Card? - answerProvide detailed
procedures for performing maintenance requirements
Which of the following is one of the primary 3M responsibilities of the Department
Head? - answerReview and or approve alert details along with check notes/flip page
reports
What does the acronym NMR mean? - answerNo Maintenance Required
Who is responsible for reviewing PMS assignments, perform quality maintenance IAW
procedural documentation? - answerMaintenance Person
What is the top hierarchy for MIP line out? - answerMIP scheduling aid
What is the primary source data for maintenance scheduling software? - answerNavy
PMS CD/DVDs
What does TGL stand for? - answerTag Guide List
This control document is used for administering labels (OOC and CAL). It provides
sequential listing of all OOC and CAL instruments? - answerInstrument Log
What provides a listing of the MIPs for systems and equipment assigned to each Work
Center, and systems and equipment not requiring PMS or currently being evaluated for
PMS? - answerList of Effective Pages
Which of the following are NOT identification markers on shipboard HAZMAT
containers? - answerSYSCOM Control Number
What is the purpose of the Current Ships Maintenance Project (CSMP)? -
answerProvides shipboard maintenance managers with a consolidated listing of
deferred maintenance to identify the material condition of the ship.
What does INSURV stand for? - answerBoard of Inspection and Survey
What is the three segment code used for cataloging MRCs? - answerSYSCOM MRC
Control Number
Technical PMS discrepancies that could have a detrimental effect on personal safety,
safety of ship, or could result in significant equipment damage, are classified as what
type of Technical Feedback Report? - answerUrgent
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller Arthurmark. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $16.99. You're not tied to anything after your purchase.