100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
MGMT 404 Course Project: Getta Byte Software Project |Getta Byte Software project final.2020/2021|DeVry University $15.99   Add to cart

Other

MGMT 404 Course Project: Getta Byte Software Project |Getta Byte Software project final.2020/2021|DeVry University

 0 view  0 purchase
  • Course
  • Institution

MGMT 404 Course Project: Getta Byte Software Project |Getta Byte Software project final.2020/2021|DeVry University

Preview 3 out of 23  pages

  • July 16, 2022
  • 23
  • 2021/2022
  • Other
  • Unknown
avatar-seller
Running Head: Getta Byte Software project




Crystal Persad

Devry University

Professor Teodor Sauca

31st July, 2020

Getta Byte Software Project

,Getta Byte Software project


Contents
1. Introduction..............................................................................................................................3

1.1 Project goals and objectives..............................................................................................3

1.2 Management of the project...............................................................................................4

1.3 Internal and external factors that may affect processes and procedure of the project......4

2 Stakeholder Engagement Plan...............................................................................................10

3 Communication management plan........................................................................................11

4 Project Scope Statement........................................................................................................13

5 WBS And the Project Schedule.............................................................................................16

5.1 WBS................................................................................................................................16

5.2 Project scheduling...........................................................................................................18

6 References..............................................................................................................................20




2

, Getta Byte Software project


1. Introduction
1.1 Project goals and objectives

The Getta Byte Software project is a mission that is formed with the main goal in mind of

substituting the on-going manual online-based billing system that will enable a concise, easy, and

fast data entry system. It is worth noting that the existing system has the capability of helping the

company to carry out the duties in daily operations. This is quite fine, but there are a few

challenges that call for an online system. The first concern is that the existing system is manual

and, therefore, time-consuming and very inaccurate. A lot of time is needed in entering the

information into the system, and the result is the inconsistency of the data entered and, therefore,

putting the company at risk. The solution to this problem is to come up with an automated

system that shall be very fast and produce accurate data. The system shall be base on the online

operation, which will enhance an easy way of entering the data, conceive a dynamic update

towards the receivables. The system shall have a goal of saving up to 25 % of the total labor per

month since human resources to operate the billing system shall be reduced. The extra cost saved

by the company shall be used elsewhere and hence, raising the total profits made by the company

each month. The project focuses on working with a bunch of people to spread risks in the

company. These people shall include the CFO, CEO, the billing department, and also customer

care services. The success of the project shall be attributed to the fact that the billing cycles are

reduced to more than 30% each month.

As per the project schedule, it is expected that the first piloting shall be done by September

1st. This shall imply that the development and testing of the software shall be done by 15th

August. This shall give an ample time to facilitate the first piloting study and see if the system is

working correctly and in accordance to the expectations and goals of the project. The final real


3

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller academia1434. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

83637 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling

Recently viewed by you


$15.99
  • (0)
  Add to cart