100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
IASSC LSSGB EXAM 2022 BEST EXAM WITH SOLUTION $9.99   Add to cart

Exam (elaborations)

IASSC LSSGB EXAM 2022 BEST EXAM WITH SOLUTION

 7 views  0 purchase
  • Course
  • Institution

If the chance that any one of five telephone lines is busy at any instant is 0.01, then what is the probability that all the lines are busy? A. (0.01)^4 B. (0.01)^5 C. (0.01)^6 D. (0.01)^10 - B. (0.01)^5 N = 5, p = 0.01, x = 5 Apply Standard formula for Binomial Distribution. Thus, opt...

[Show more]

Preview 3 out of 28  pages

  • August 23, 2022
  • 28
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
IASSC LSSGB EXAM 2022 BEST EXAM WITH SOLUTION


If the chance that any one of five telephone lines is busy at any instant is 0.01, then
what is the probability that all the lines are busy?

A. (0.01)^4
B. (0.01)^5
C. (0.01)^6
D. (0.01)^10 - B. (0.01)^5



N = 5, p = 0.01, x = 5 Apply Standard formula for Binomial Distribution. Thus, option b is
the correct answer.

Who should complete the control phase after the successful completion and
implementation of the first four phases of DMAIC?


A. The green belt alone; the project has been successfully completed.

B. The process owner alone; it is his responsibility to take the project from here.

C. The process owner and the Green Belt together should complete the control phase.

D. The complete team is the most desirable option. - D. The complete team is the most
desirable option.

The control phase should be completed by the entire team. Control is not an
insignificant phase of the DMAIC process. The green belt or the process owner alone
may not have the ability and knowledge to structure the last control step. So option d is
correct.

To increase the power of the experiments, what is the best choice in the hands of a Six
Sigma team?

A. Increase Sample Size
B. Reduce Sample Size
C. Reduce Significance level
D. All of the above - A. Increase Sample Size

Options b and c are not serious considerations, and thus option d can be ruled out.
Conceptually, increase in sample size increases the possible accuracy of the
experiment, and thus an increase in power. So, option a is the correct answer.

,Hypothesis testing is usually done to:

A. Statistically validate if a sample mean belongs to the population

B. Statistically validate if means of two groups are the same or if they are significantly
different

C. Statistically validate if variances of two groups are the same or if they are different.

D. All of the above - D. All of the above

Statistically validate if a sample mean does belong to the population, find if means of
two groups are the same or if they are significantly different, and validate if variances of
two groups are the same or if they are different. Option d is the correct answer.

What is the concept behind PDCA?


A. The Deming/Shewhart cycle
B. Process flow
C. Continuous improvement
D. Satisfying suppliers - C. Continuous Improvement


The key question phrase is "concept behind." Option b is inappropriate and does not fit
the question. Option a would be correct if the question requested another name for
PDCA. Answer option d could be one of the number of potential positive outcomes of
this activity. However, the concept behind and objective of PDCA is that of continuous
improvement.

What are the six experiments called while performing one experiment with five
repetitions?

A. Randomization
B. Replications
C. Planned grouping
D. Sequential - B. Replications

Repeated trials or replications are often conducted to estimate the pure trial-to-trial
experimental error so that lack of fit may be evaluated. Randomization frees an
experiment from the environment and other biases. Sequential experiments are
conducted one after another, not all at the same time. Adjustments may be made in the
experimentation based upon the knowledge obtained. Almost any DOE contains
planned grouping. So answer option b is correct.

, Which type of chart is used for small shifts in variation?

A. Xbar
B. p
C. c
D. CUSUM - D. CUSUM

The other charts are traditional control charts that are designed to identify significant
shifts in process variation, while the CUSUM chart is designed to show small variation
shifts

What are the distinct types of variation that are noted down in control charts?

A.Special and assignable
B. Random and chance
C. Chance and assignable
D. Normal and random - C. Chance and assignable

Chance and assignable are the two varieties of variation. Chance variation is also
referred to as normal or random (among others). Assignable variation is also called
special or non-normal. So option c is correct.

Which of the following is an advantage of the production of a product in large lots?

A. Machine efficiencies
B. Customer delivery lead times
C. Product transportation
D. Product quality - A. Machine efficiencies


According to the proponents of lean manufacturing and continuous flow, options b, c,
and d are all disadvantages. For large lot processing delivery lead times increases,
transportation of products increases, and products have more potentiall for damage.
Option a is generally recognized as the main advantage of large batch runs that may be
more than offset by the disadvantages. So option a is the correct choice.

A sample is to a statistic as a population value is to a:


A. Sample
B. Unit
C. Parameter
D. Measurement - C. Parameter

A statistic is derived from a sample. A parameter is derived from a population. So option
c is correct.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller PossibleA. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

78998 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.99
  • (0)
  Add to cart