100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
Oregon Construction Contractors CCB Test 2022 (verified answers) $12.99   Add to cart

Exam (elaborations)

Oregon Construction Contractors CCB Test 2022 (verified answers)

3 reviews
 281 views  7 purchases
  • Course
  • Institution

Oregon Construction Contractors CCB Test 2022 (verified answers)

Preview 4 out of 57  pages

  • August 26, 2022
  • 57
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers

3  reviews

review-writer-avatar

By: lehernandez3639 • 1 year ago

review-writer-avatar

By: ichilakil32 • 1 year ago

review-writer-avatar

By: janguiano • 1 year ago

avatar-seller
Oregon Construction Contractors CCB
Test 2022 (verified answers)

A person who engages in a business or activity that involves construction new water
wells must possess a license from the: ANS:- Oregon Water Resource Department
(OWRD)


True or False
Prompt billing and prompt collections make for a healthier cash flow. ANS:- True


Oregon OSHA consultants WILL NOT: ANS:- Issue citations or propose penalties for
violations of OSHA standards.


1) Questions to answer when preparing your project schedule include all of these
except:


- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? ANS:- - All of these are
questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity?


For Notice of Right Lien purpose, a commercial improvement is defined as: ANS:- A
structure that is not used or intended for use as a residential building


I am the residential original contractor and I provide labor and materials for the
project. Who do I need to give a notice of Right to Lien to? ANS:- Mortgagee

,A quantity survey is also referred to as a: ANS:- Take Off


Tagout involves placing a warning tag: ANS:- On an energy-isolation device


Other than Take Off, other common construction estimate types include all, except:
ANS:- Ballpark Estimates


True or False
An on-site of host employer is responsible for ensuring a safe place of employment
for leased or temporary workers. ANS:- True


The state unemployment tax rate varies base on: ANS:- The history of
unemployment claims against the employer.


Stop work order violations can result in: ANS:- - Any of these could be the result of
failure to comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties


The ___________________ gives an overview of the project, deadlines, and general
requirements. ANS:- Invitation to Bid


"Job Logic" refers to: ANS:- The sequence of work


True or False
Self-employment taxes apply to all forms of business entities. ANS:- False


- Money earned and money spent are accounted for in the year they are received or
paid, respectively. ANS:- In the Cash Method


The Itemized Summary is the basis for: ANS:- A complete and accurate estimate of
project costs and lists all major items of work in the order they are to be performed.

,A major difference between the EIN and the BIN is: ANS:- One is federal and one is
state


Poor construction and storage practices can result in _________________ inside the
structure walls. ANS:- Molds and fungus


Builders now must use corrosion-resistance flashing in these specified locations,
except: ANS:- Surrounding all interior bedroom doors.


Compliance with environmental regulations can protect a contractor from:


- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims ANS:- - All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims


Using the Quantity Take-Off method for estimating, you begin by estimating the cost
of _________________ for each individual task. ANS:- Labor and materials


Contractors must apply for permits through: ANS:- Their local building department


A cost effective method for managing material costs and keeping inventory costs
down is the: ANS:- JIT - Just In Time


These are materials prohibited form open burning in Oregon except for: ANS:-
Unpainted and untreated scrap wood


An owner-seller may comply with the Homebuyers Protection Act (HPA) by:


- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,

, - Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow
ANS:- - Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow


What are the possible consequences that a contractor may face if he or she fails to
provide the information to the Owner About Construction Liens when required?


- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended
ANS:- - All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended


Withheld taxes are considered to be "_____________" funds that do not belong to
the business and cannot be used for any other purpose. ANS:- Trust


The major purpose of the building exterior shell is to: ANS:- Provide protection for
the building at its exterior boundaries and to enclose a suitable interior environment


A project manager can be involved in more than one construction project at the
same time. ANS:- True


The building exterior shell may consist of:


- All of these are part of the building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies ANS:- - All of these are part of the building exterior shell

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Welch1. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

79223 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.99  7x  sold
  • (3)
  Add to cart