Which of the following methods of bidding is required on most projects for which government funds are to be used?
A. Direct
B. Negotiated
C. Invited
D. Public
Fast track
Which of the following project delivery methods always requires preparation of several individual bid-docum...
NCARB practice problems Solved And Graded A+
Public - Answer Which of the following methods of bidding is required on most projects for which government funds are to be used?
A. Direct
B. Negotiated
C. Invited
D. Public
Fast track - Answer Which of the following project delivery methods always requires preparation of several individual bid-document packages?
A. Design-Bid-Build
B. Fast Track
C. Design Build
D. Turnkey
Specifications - Answer diagram on paper
recommend qualified contractors - Answer In developing a list of bidders for a private
project, the architect's role is to
A. select the contractor
B. recommend qualified contractors
C. rank the contractors in order of preference
D. discourage owner-recommended contractors
surety - Answer A contractor's ability to obtain a performance bond for a specific contract is determined by the
A. owner
B. architect
C. contractor
D. surety
Financial statment - Answer AIA Document A305, Contractor's Qualification Statement, requires which of the following supplemental documents to be provided by the applicant? A. financial statement
B. list of subcontractors
C. list of proposed consultants
D. list of proposed material suppliers
Has the right to waive irregularities and accept the bid - Answer After considering all the bids, the owner favors a bid with irregularities. According to AIA Document A701,
Instructions to Bidders, the owner has which of the following rights/responsibilities regarding an irregular bid? NCARB practice problems Solved And Graded A+
A. Has the right to waive irregularities and accept the Bid
B. Has the right to extend the bidding period for corrections
C. Must informally request corrections from the bidder
D. Must only consider bids without irregularities
multiple prime contracts - Answer A local bank has a budget of $30,000,000 to construct a new main office. The bank wants to use contractors who are customers of the bank; however, none of the bank's contractor customers can bond the entire amount of the contract. Which of the following delivery methods would be best suited
to meeting the bank's contractor selection goal?
A. Design-Build
B. Fast-Track
C. Multiple-Prime Contracts
D. Additive change Orders
notification of future addenda - Answer Which of the following is an appropriate item for the prebid conference?
A. Occupancy-permit procedures
B. Notification of future addenda
C. Pre-commissioning procedures
D. Status of Change Orders
The contractor is required to replace the lighting fixtures wiht the fixtures specified without remibursement - Answer A contractor under a fixed-price construction contract has allowed the electrical subcontractor to install lighting fixtures other than those stated in the contract documents. The electrical subcontractor and the contractor both believe the substituted fixtures to be of equal value. The construction
is substantially completed and the architect rejects these fixtures. According to AIA Document A201, General Conditions, which of the following actions must be taken regarding the lighting fixtures?
A. The architect must accept the lighting fixtures as installed without a cost credit to the owner. B. The architect must accept the lighting fixtures as installed but with a cost credit to the owner.
C. The contractor is required to replace the lighting fixtures with the fixtures specified
without reimbursement.
D. The contractor is required to replace the lighting fixtures specified but is entitled to
reimbursement for labor costs for the replacement.
the bidding climate - Answer Architect estimates of construction cost based on final documents should consider which of the following?
A. known changes order sums
B. the bidding climate
C. the amount of monthly certificate of payment
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller EvaTee. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $12.99. You're not tied to anything after your purchase.