100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
DBIA Test Questions and Answers 2023 with complete solution $9.49   Add to cart

Exam (elaborations)

DBIA Test Questions and Answers 2023 with complete solution

 10 views  0 purchase
  • Course
  • Institution

DBIA Test Questions and Answers 2023 with complete solution Project Delivery System How team members are organized, establishes when parties engage, determines roles of parties, and determines sequence of design, procurement, and construction (db, cmar, dbb) Procurement Method how team member...

[Show more]

Preview 2 out of 9  pages

  • May 11, 2023
  • 9
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
avatar-seller
DBIA Test Questions and Answers 2023 with complete
solution
Project Delivery System
How team members are organized, establishes when parties engage, determines roles
of parties, and determines sequence of design, procurement, and construction (db,
cmar, dbb)
Procurement Method
how team members are selected (QBS, best value, low price, sole source)
contracting approach
how team members are paid (fp, gmp, cost reimbursement, target price, unit price)
Design-Bid-Build (DBB)
linear, sequential process, A/E selected on qualifications, GC selected on low price,
design is fully completed without input from GC, A/E acting in owner's interests, with a
historically strong bond, process is well-established and understood
construction manager at risk
similar org structure to DBB, construction manager selected by QBS or best value,
contractor provides precon services, negotiated gmp contracting approach, open book
estimating process, potential to fast track project, construction cost determined before
design completed, potential issues over what is reasonably inferable from gmp design
documents
Design-Build
The owner contracts with one entity (a person or firm) to provide both design and
construction services, designer and contractor have a direct contractual relationship,
selected by QBS or best value, wide spectrum of contracting approaches and
organizational structures, single point responsibility, owner does not manage designer,
owner exposure to claims is significantly reduced
engineer procure construct (epc)
similar to design build, in industrial and power generation sectors, systems and
performance testing are central to scope, contractor will typically perform engineering
with its in-house staff, owner has need for single point responsibility, contracts include
plant and process performance guarantees, contract items include performance and
schedule liquidated damages and limitations of liability
Multiple Prime Contracting
owner contracts with multiple trade contractors, attributes are typically similar to dbb,
owner's ability to schedule and coordinate the work
Integrated Project Delivery (IPD)
multi-party agreement - all parties equal, QBS procurement and target pricing contract
approach, private sector use (limited at this time), key: owner's ability to accept risk
public-private partnership (p3)
Instead of government building and maintaining major infrastructure (such as highway,
water treatment plant), build and maintenance is outsourced to a private company.
Opposed by public sector unions. this is not considered a delivery system but its
underlying approaches are delivery systems and typically use DB. multiple procurement
and contracting approaches

, shift left
intense efforts to establish scope early in the process; drives early team formation to
include key trade subcontractors; can enable big decisions to be made early, affect
project outcomes at lowest cost, establish a need for co-location and collaboration, and
compress time during concurrent design and construction
traditional design build
typically two-phase best value procurement with lump sum contract; owner defines
project requirements and scope of prescriptive work; use of performance-based
technical requirements with limited prescriptive specifications
progressive design build
design and price are progressively developed after the design-builder is under contract;
final project cost and schedule commitment is not established as part of the selection
process; two phases: preliminary services and final design and construction services
criteria documents
describe the end result
bridging documents
prescribes how to achieve the end result
design bid build paradigm
prior to bidding, owner undertakes a process to design the project and all of its details to
100% complete plans and specs. the owner is therefore responsible for success or
failure of details of the design, and warrants the sufficiency of design to the contractor.
the owner is therefore liable to the contractor for any gaps between plans and
specifications and owner's requirements for project performance
design details responsibility
the owner should define its performance requirements and award the contract on the
basis of preliminary design; this makes the design-builder responsible for completing
the design in accordance with the owner's performance requirements. that also causes
the design-builder to warrant the sufficiency of the design to meet the owner's criteria
and the sufficiency of the design to subcontractors/suppliers that have no design
responsibility
uniformat
subdivides project by functional elements, focuses on systems and assemblies, useful
for preliminary information and early design phases, aligns with BIM models and
conceptual estimating
masterformat
subdivides work by results/trades, focuses on building materials, products, and
activities, useful for detailed information during final design and construction phases,
and aligns with detailed estimating
functional requirement
a specific business need or behavior as seen by an external user of the system;
describe what functions/operations the end product must perform/accommodate;
examples: regulatory, permitting, economic, and others that define functions and
operational capability. "Build an office building on my existing lot to provide office space
for 1,000 workers"
performance requirement

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller katoinyambi96. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.49
  • (0)
  Add to cart