AAAE CM Module 2 Exam Questions & Answers NPIAS - ANSWER-Federal plan for airports, addresses development and planning on projects eligible for AIP. State Aviation System Plans - ANSWER-more detailed on how airports within a state can meet states needs Metropolitan or Regional System Plans...

[Show more]

Preview 4 out of 35  pages

  • June 5, 2023
  • 35
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
  • AAAE CM Module 2
  • AAAE CM Module 2
avatar-seller
Bensuda
AAAE CM Module 2 Exam Questions &
Answers
NPIAS - ANSWER-Federal plan for airports, addresses development and planning on projects eligible for
AIP.



State Aviation System Plans - ANSWER-more detailed on how airports within a state can meet states
needs



Metropolitan or Regional System Plans - ANSWER-more specific indexable and consider capacity,
intermodal access and local travelers



Airport Areas - ANSWER-Airside, Landside



Landside - ANSWER-intermodal access,parking, rental cars ticketing, bag claims, etc



Airside Areas - ANSWER-Runways, taxiways, fence, etc.



ALP-Grant Assurance 29 - ANSWER-requires ALP be updated at all times,

shows land, terminal and facilities. protection zones, approach areas, proposed development and
unusual design features



ALP Contents - ANSWER-Standard ALP contains following:

1 Cover sheet-signature blocks, and location maps

2 ALP Sheet-data of existing and fyture airfield layout

3 Airport Layout Drawing

4 Airport Airspace Drawing-intended to show imaginary surfaces

5 Inner Portion of Approach Drawing-profile view of runway approaches and obstructions and surfaces
associated with the Terminal Instrment Procedures (TERPS)

6

,Terminal Area Drawing-and plan depicting terminal and surrounding facilities and heights. lighting and
obstructions, also highway routes to and from airport and main business district

7 Land Use Drawing-on Airport and off airport depicting existing and recommended use of all land with
property line to at least the 65 DNL noise contours

8 Runway Departure Surfaces Drawing-depicts available departure surfaces

9 Airport Property Map-how tracts were acquired and easements, termed EXHIBIT A on AIP grant
applications

10 Data sheet-airport and runway data tables and wind rose(diagram showing percentage of time wind
blows from a direction and speed)

11. Facilities layout-exisisting and future facilities

12 Utilities drawing-location and capacity of utilities

13 Airport access plan-major routes and modes of transportation that serve airport



ALP is signed by FAA making it a legal document,

drawings typically done with computer design software that link features on map with Geographic
Information Systems (GIS), FAA uses eALP which allows sharing ALP data



5 Primary Functions of ALP - ANSWER-1 FAA approved plan required to receive AIP and PFC funding

2 blueprint for airport development

3 public document that serves as a record of aeronautical requirements

4 enables FAA and Sponsor to plan for future improvements

5 working tool for staff,



Notice of Propsed Construction or Alteration-FAA StNdard Form SF-7460-1 - ANSWER-notification of
construction or alteration has to be given 30 days in advance



Notice of Landing Area Proposal-Form SF-7480-1 - ANSWER-notification of activation or alteration of a
landing area



ALP - ANSWER-ALP should be Reviewed and Vaidated every 2-7 years. Necessary when existing ALP
cannot accommodate forecast needs or meet design standards

,Grant Assurance Requirements for ALP - ANSWER-1 Property lines

2 location and nature of existing and proposed facilities (ie. runways, taxiway, parking lots)

3 existing and proposed non-aviation areas and improvements (ie. parking lots, access roads, water
retention ponds)



ALP Approval - ANSWER-FAA approves that ALP must be Safe, Useful and Efficient. ALP must be
submitted at Airports District Office (ADO)



Safe - ANSWER-safe operation of aircraft



Useful - ANSWER-make best use of airport land while minimizes impact of offairport structures



Efficient - ANSWER-planned capacity is sufficient for forecast demand



FAA ALP 3 Levels of Approval - ANSWER-Unconditional (met environmental processing),
Conditional(environmental processing has not been completed for all items) and Mixed (completed
elements can proceed others cannot until approval is received)



National Environmental Policy Act (NEPA) - ANSWER-review for environmental



FAAs Airport Data and Information Program - ANSWER-guides sponsors on collection, submission and
management or airpirt data ensuring airport users most current information-achived through AIRPORT
MASTER RECORD



Airport Master Record - ANSWER-describes basic operational and services data of the airports



Airport Data Record- 5010 Form - ANSWER-Airport operator required to complete annually, FAA uses to
complete aeronautical charts and Airport Facility Directory (A/FD)



Airport Facility Directory (A/FD) - ANSWER-pilots use as reference (runway lengths, Airport use, elevation
and runway slope)

, Form 7460 Notice of Proposed Construction or Alteration-Part 157 Requirement - ANSWER-required
whenever there is proposed development



Form 5010 and NOTAMS - ANSWER-Pilits rely on information internet A/FD (provided on Form 5010).
Temporary changes are issued as NOTAMS. NOTAMS can be cancelled when the information becomes
part of the A/FD



Planning Levels - ANSWER-1 NPIAS

2 Statewide integrated airport systems

3 Regional/metropolitan integrated airport systems

4 Airport Master Plans



Basic Guiding Principle of Planning Process - ANSWER-development of a safe efficient airport system
with uniform design and operational standards



NPIAS Project Categories - ANSWER-1 Purpose-safety, rehabilitation, capacity, standards

2 Physical Component-runway, taxiway, apron, equipment acquisition

3 Type of work-construct, expand, improve



Metropolitan (or Regional) Airport System Plan (MASP) & State Aviation System Planning (SASP) -
ANSWER-plan that asses how to integrate within the area, identifies role of each airport in the area and
forecasts proposed future activities



Airport Sysrem Planning 4 elements - ANSWER-1 system needs identification

2 system-wide development cost estimate

3 studies,surveys and other planning actions to decide which aeronautical needs will be met.

4 standards prescribed by state for development on non-primary public use airports



Airport Master Plan - ANSWER-primary document for long range planning. sets direction of development
for an.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Bensuda. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $10.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

77254 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$10.99
  • (0)
  Add to cart