Exam (elaborations)
RETA CARO | Questions With 100 % Correct Answers | Verified
- Course
- Institution
Which refrigerant has the highest mass flow requirement at the same evaporator and condensing temperature? - CFC-12 which refrigerant is the first to be phased out by Montreal Protocol - CFC-12 As the ratio between the evaporator and condensing pressure increases - the theoretical discharge tem...
[Show more]