100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ISA Utility Specialist (Chapters 1-7) | 436 Questions with 100 % correct Answers | Verified and updated $15.49   Add to cart

Exam (elaborations)

ISA Utility Specialist (Chapters 1-7) | 436 Questions with 100 % correct Answers | Verified and updated

 299 views  5 purchases
  • Course
  • ISA Utility Specialist
  • Institution
  • ISA Utility Specialist

In the U.S., enforcement of safety work rules resides with: - Occupational Safety & Health Administration (OSHA) Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - ensuring reliable service A comprehensive veget...

[Show more]

Preview 4 out of 45  pages

  • July 15, 2023
  • 45
  • 2022/2023
  • Exam (elaborations)
  • Questions & answers
  • ISA Utility Specialist
  • ISA Utility Specialist
avatar-seller
PatrickKaylian
ISA Utility Specialist (Chapters 1 -7) In the U.S., enforcement of safety work rules resides with: - ✔✔Occupational Safety & Health Administration (OSHA) Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - ✔✔ensu ring reliable service A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ vegetation management. - ✔✔proactive; integrated What is a volt? - ✔✔a unit of electrical force Major stor ms or __________ weather events are the usual cause of power outages over large areas. - ✔✔catastrophic Without __________, messages can have multiple meanings. - ✔✔context ISA BMPs provide a practical guide for implementing __________ __________. - ✔✔industry standards Electrical resistance determines how much __________ is required to move electricity along a conductor and is measured in __________. - ✔✔energy; ohms When communicating, a person's experience & __________ will influence how the person r eacts. - ✔✔perceptions Crew mobilization for a storm event is much more rapid from a __________ status. - ✔✔standby NERC standards are specific to what line voltages? - ✔✔200 kV & above An important first step in any vegetation management program should be to asses system conditions, which is often done through an __________. - ✔✔inventory Which type of cuts are less unacceptable? - ✔✔internodal cuts (e.g. topping) A worker neglecting to wear cut -resistant chaps while operating a chainsaw is committing an unsafe __________, while an employer failing to provide chaps is creating an unsafe __________. - ✔✔act; condition A conductor carrying more than __________ volts would be considered a NERC line. - ✔✔200,000 Communication is both verbal & nonverbal. When a customer is confronted with contradictory information, the person will usually believe the __________ message. - ✔✔nonverbal Voluntary safety standards for prun ing, trimming, repairing, maintaining & removing trees, & cutting brush: - ✔✔ANSI Z133 NERC standards require the reporting of all tree caused outages by __________ categories - ✔✔three A traditional cycle will schedule maintenance __________ trees grow into conductors. - ✔✔before Which type of cuts are more acceptable? - ✔✔nodal cuts (e.g. drop -crotch, thinning) The __________ -__________ rule suggests that workers should take time before starting a job to check for potentially unsafe conditions & disc uss them. - ✔✔two-minute According to ANSI Z133, the minimum approach distance for persons other than qualified line -clearance arborists for 50 kV & less is __________. - ✔✔10 feet Trees growing into contact with a single -phase distribution conductor pos e __________ threat of a tree -
ground fault. - ✔✔little Where should the final cut be made for proper utility pruning? - ✔✔just outside of the branch bark ridge and the branch collar A vegetation management scheduling unit may be an entire __________ or a __________ __________. - ✔✔circuit; geographical area 2 examples of protective equipment: - ✔✔circuit breakers lightning receptors On a storm site, cutting should not begin until all risks have been assessed & the __________ approach has been decided & adopted. - ✔✔safest Actively __________ can facilitate understanding a customer's perceptions and demonstrate the utility representati ve's sincere interest in a customer. - ✔✔listening As clearance work progresses, __________ between crews & dispatcher is critically important to determine locations of downed or damaged lines. - ✔✔communication __________ negotiation uses the best aspe cts from both hard & soft bargaining. - ✔✔interest -based An energized wire or conductor in a circuit is also known as a __________. - ✔✔phase Fast-growing, problem species are sometimes known as __________ __________. - ✔✔cycle busters Flush cuts damage which tissues? - ✔✔the trunk Clearing for a new distribution line is likely to be paid for by a __________ budget. - ✔✔capital Surface temperatures at the point of contact with high voltage can reach __________ degrees F. - ✔✔1,000 __________ _________ _ occurs when someone touches an energized fixture. __________ __________ can occur when a person touches a conductive object that is in contact with an energized fixture. - ✔✔direct contact; indirect contact A grid -based scheduling system is most likely to be used by highly __________ utilities. - ✔✔urbanized Why is utility pruning done? - ✔✔to maintain safety and rights -of-way Reactive maintenance is often called __________. - ✔✔hotspotting True or False? Guy wires are intended to help support poles but may become unintentionally energized. - ✔✔true One of the highest personal risks in a storm is __________. - ✔✔fatigue When trying to negotiate mutually agreeable solutions & gain commitment based on customer interests, the focus should be on __________, no on specific individuals. - ✔✔issues A __________ is similar to a fuse or cutout, but it resets after a predetermined time period. - ✔✔re-
closer

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller PatrickKaylian. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $15.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

72042 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$15.49  5x  sold
  • (0)
  Add to cart