ProPrac Test 2 with verified answers 2023
In which project specification division would you expect to find windows: correct answers08 In which project specification division would you expect to find structural steel: correct answers05 The Architect's responsibility in review of a submittal provides for the following: correct answersLimited checking for conformance with the contract documents Which is not a responsibility of the architect during the Construction phase: correct answersEstablish means and methods In which phase does the design team work out clear, coordinated description of the design including fully developed floor plans, sections, exterior elevations, wall sections and key details but not final details or comprehensive interior elevations: correct answersDesign Development Specifying end results that allow flexibility and creativity to meet requirements instead of describing exact characteristics or specific named products is known as: correct answersPerformance Specifying The specification 00 section that establishes a consistent understanding of the procedures that bidders should follow in preparing their bids such as consideration of bids is: correct answersInstruction to Bidders The right for the owner to reject any or all bids is typically included in the bidding documents: correct answersTrue
Written for
- Institution
- ProPrac t 2
- Course
- ProPrac t 2
Document information
- Uploaded on
- August 4, 2023
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal