ITEC 355 Final Exam All Possible Questions and Answers Complete
2 views 0 purchase
Course
ITEC 355
Institution
ITEC 355
ITEC 355 Final Exam All Possible Questions and Answers Complete
Decreasing costs by laying off workers while keeping the same output, the American University Mail Services will
increase labor productivity and increase utilization
If The American University Mail Services has capacity to handle...
itec 355 final exam all possible questions and ans
Written for
ITEC 355
All documents for this subject (6)
Seller
Follow
magdamwikash23
Reviews received
Content preview
ITEC 355 Final Exam All Possible Questions and Answers
2023-2024 Complete
Decreasing costs by laying off workers while keeping the same output, the
American University Mail Services will
increase labor productivity and increase utilization
If The American University Mail Services has capacity to handle 24,000 packages,
which of the following arrival rates make the system stable
17,000 & 23,000
Assume that AU students receive 30,000 packages in April. The cost of labor to
deliver those packages is $60,000 while the cost of truck operations is $10,000.
What is the multifactor productivity measure for April
0.43 packages/dollar
Theoretical Flow Time is
the average time needed to pass through the system
a bottleneck
- is a capacity constrained resource
- can easily be identified by whichever activity in a system takes the longest
- can create long wait times
- is the resource that limits the throughput rate of the process
Little's Law
I=R*T
The time it takes for a unit to flow through an entire system is called
flow time
Capacity utilization may be formulated as
actual capacity/design capacity
True or False: Probability (no waiting) = 1-Probability(waiting)
true
The American University Shuttle Service provides students the ability to access
areas of campus and Tenleytown. Students look for the system to arrive on time
each day, in the same manner, and without any deviations from the schedule.
Which of the 5 dimensions of service quality does this describe?
reliability
What are the three elements of Six Sigma
unit, defect, and opportunity
What happens to Q* as Cu (cost of underage) increases assuming Co (cost of
overage) stays constant?
increases
What formula is for capacity
1/Cycle time
Which of the following is equal to the entire capacity of a process
the bottleneck capacity
What is the title of this class
Operations Management
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller magdamwikash23. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $10.49. You're not tied to anything after your purchase.