100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
CTS-I, Top Exam Questions and answers, 100% Accurate. Graded A+ $9.49   Add to cart

Exam (elaborations)

CTS-I, Top Exam Questions and answers, 100% Accurate. Graded A+

 7 views  0 purchase
  • Course
  • Institution

CTS-I, Top Exam Questions and answers, 100% Accurate. Graded A+ Before developing a project plan, it is important to (CH3) - -have a clear understanding of the scope of work A scope statement should include: (CH3) - -Both in-scope and out-of-scope items The key elements of a project shou...

[Show more]

Preview 2 out of 13  pages

  • August 12, 2023
  • 13
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
CTS-I, Top Exam Questions and
answers, 100% Accurate. Graded A+

Before developing a project plan, it is important to (CH3) - ✔✔-have a clear understanding of the scope
of work



A scope statement should include: (CH3) - ✔✔-Both in-scope and out-of-scope items



The key elements of a project should be driven by: (CH3) - ✔✔-the client's need



What is a dependency within a project task schedule? (CH3) - ✔✔-A task that cannot begin before
another task has been completed



Project budget refers to what? (CH3) - ✔✔-The amount of labor and materials the project manager has
allocated to complete the project.



A primary reason for attending construction meetings is to: (CH3) - ✔✔-Identify changes to the original
design that will affect the av installation.



In the event of a change in the placement of air-conditioning ducts in a boardroom, which of the
following documents should the AV integrator submit first? (CH3) - ✔✔-RFI



Which of the following documents should an AV integrator submit in the event that a manufacturer has
discontinued a projector model? (CH3) - ✔✔-RFC



The ANSI/INFOCOMM 2M-2010 Standard Guide for AV Systems Design and Coordination Process lays
out a procedure for determining the_________ (CH3) - ✔✔-project communication that needs to take
place on a given project.

, After which of the following activities is an AV project completed? (CH3) - ✔✔-System closeout activities
are completed



Which set of drawings should you reference to view the ductwork that goes through the building? - ✔✔-
Mechanical Drawings



Which set of drawings should you reference to locate a power outlet for a video display? - ✔✔-Electrical
Drawings



Which of the following must the as-built drawings show? - ✔✔-Details of the system as finally installed



OFOI - ✔✔-Owner Furnished Owner Installed (you will not need to install)



What does an elevation flag on a plan drawing indicate? - ✔✔-Related elevation drawings



What type of drawing would you use to find out exactly how the projector should be mounted to the
ceiling? - ✔✔-Detail Drawing



Which of the following is the AV team likely to perform during new construction? - ✔✔-• Install
sprinkler system

• Run cables and install mounts - Answer

• Mount drop ceiling

• Build the firewall



What is the primary reason an AV installer should attend weekly construction meetings? - ✔✔-ID
changes that affect the AV installation



Which of the following is the most important consideration during the installation of AV systems in a
client-occupied space? - ✔✔-Avoiding disruptions to your client's business

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller PassPoint02. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $9.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

75632 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$9.49
  • (0)
  Add to cart