Nails used for installing Hardboard panel siding vertically must accommodate the sheathing and penetrate the framing a minimum of how much?
1-1/2 inches
When framing openings in floors with a header and trimmer joists, wha...
Az ROC Trade Exam B-3 License Exam 2023 Questions
and Answers Graded A+
Nails used for installing Hardboard panel siding vertically must accommodate the
sheathing and penetrate the framing a minimum of how much?
1-1/2 inches
When framing openings in floors with a header and trimmer joists, what
maximum header joist span is allowed with a single member header?
4 feet
Above the handrail and below the head, what is the minimum clear opening on a
stairwell?
36 inches
When installing vinyl siding, how much overlap should you allow for thermal
expansion?
1 inch
What is the first step you should take when applying specialty finishes?
Read the manufacturers use instructions.
What is the appropriate gap between gypsum board and a tub surround?
1/4 inch
Sprayed fire resistant materials are identified by ____________ and thickness
required for a given rating.
Density.
What is the most important factor in determining the "R" value of blown in
insulation?
Density.
Refer to the illustration of a 2 story house w/ lap siding plans, (complete set of
plans at the test center), What are the lengths of the second floor trusses?
30 feet 6 inches and 13 feet 5 inches.
Refer tot the illustration of a 2 story house w/ lap siding plans, (complete set of
plans at the test center), what is the height of the foyer in inches?
inches.
A ____________ is a system component that receives the inputs from automatic
and manual fire alarm devices and may be capable of supplying power to the
detection devices and transponders or off-premises transmitters.
Fire Alarm Control Unit.
On graded sites, the top of any exterior foundation shall extend above the
elevation of:
The street gutter at point of discharge.
What is the thickness of a footing for a single story frame residence?
6 inches.
Which of the following is the most important when deciding the depth of a
footing?
Depth of the frost line.
Refer tot the illustration of a 2 story house w/ lap siding plans, (available at the
testing center) How many acres is the site for the house plan?
,1/3 acre.
Which of the following can be used as backfill outside a foundation without being
compacted?
Controlled low strength material.
For soils classified as sandy gravel, foundation pressure shall not exceed how
many PSI?
3000 Pounds per Square Foot.
Which of the following shall not be assumed to have a load bearing capacity for
foundations?
Organic Silt
The soil report states that the soil is sandy-gravel. What is the soil's load-bearing
value?
3,000 PSF
According to code, what is the minimum required width of a footing in soil rated
at 2000 PSF for a single story building with 8 inch thick masonry walls?
12 inches
What is the minimum footing width of a one story light-frame construction
building?
12 inches
Which of the following would cause crazing (superficial cracking) on the surface
of concrete?
Early drying due to late curing or excessive water on surface.
Refer to the illustration of a 2 story house w/ lap siding plans, (complete set of
plans at the test center), How many cubic yards of concrete is needed for the
floor and garage slabs less the fireplace area?
23 cubic yards.
According to code, the minimum thickness of a concrete slab that is supported
directly on the ground shall be ___________ inches.
3.5
According to the code, plain concrete for basement walls and foundations shall
be what minimum compressive strength (psi)?
2500 psi
the frost line is 24 inches below the surface. What is the required depth of a
footing?
Below the frost line.
A lot shall be graded to drain surface water away from foundation walls for a
minimum of ___________ feet.
10
What is the minimum overlap of a vapor barrier in an unvented crawl space.
6 inches
The minimum dept of footings below the undisturbed ground surface shall
be_______.
12 inches
According to code, footings shall be stepped when?
If the ground surface slopes more than on unit vertical to ten units horizontal or where
necessary to change the top footing surface elevation.
, What is the minimum concrete psi that is required for basement walls or slabs not
exposed to weather?
2500 psi
Refer to the illustration of a 2 story house w/ lap siddng plans, (complete set of
plans at the test center), How many cubic yards of concrete would be required for
the footer only?
10 to 12 cubic yards.
In conventional light-frame construction on soil with a load bearing value of 2,000
psi for a one story building with 8 inch hollow concrete masonry walls, what is
the minimum thickness of the spread footing?
6 inches
Concrete Spread footing projections shall be at least ___________ and shall not
exceed the thickness of the footings.
2 inches
A concrete slab-on-ground cast monolithically with the footing placement at the
footing top and bottom?
1 number 5 of two number 4 bars in the middle third of the footing.
What is the minimum footing width of a 2 story light frame construction building
with a soil bearing capacity of 2000 PSF?
12 inches
According to code, foundation plates or sills shall be anchored tothe foundation
with bolts spaced not more than _________ inches apart?
72 inches
You are finishing a concrete surface, defects of the finished product such as
crazing, dusting and spalling are caused by?
Overworking the concrete surface.
Floating adn troweling concrete too early in the curing process can cause?
Water to rise and weaken concrete surface.
How close can your string line be to the cinder block wall you are building?
1/16 inch
Wall ties should be placed how far from the edge of a masonry unit?
1/2 inch
What is the maximum vertical distance allowed between headers when building
multi-wythe masonry walls?
24 inches
What is the ideal size of head and bed joints in masonry construction?
3/8 inch
What is the minimum depth of a hearth in front of a masonry fireplace?
16 inches
What is the required minimum diameter of bolts used to anchor a roof structure
to a masonry wall?
1/2 inch
How high above the paved surface does the weep screed need to be?
2 inches
Weep screeds shall be a minimum of ___________ corrosion resistant weep
screed or plastic weep screed.
The benefits of buying summaries with Stuvia:
Guaranteed quality through customer reviews
Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.
Quick and easy check-out
You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.
Focus on what matters
Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!
Frequently asked questions
What do I get when I buy this document?
You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.
Satisfaction guarantee: how does it work?
Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.
Who am I buying these notes from?
Stuvia is a marketplace, so you are not buying this document from us, but from seller magdamwikash23. Stuvia facilitates payment to the seller.
Will I be stuck with a subscription?
No, you only buy these notes for $14.49. You're not tied to anything after your purchase.