CTS Exam Prep 100% VERIFIED SOLUTIONS 2023//2024
CTS Exam Prep 100% VERIFIED SOLUTIONS 2023//2024 What are the four teams that comprise the overall Project Team? - ANSWER Owner, Design, Installation, and Management Who would belong to the Design team? - ANSWER Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? - ANSWER Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - ANSWER Owner Which group represent the generic roles that are important to the Project process? - ANSWER Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - ANSWER Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - ANSWER Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - ANSWER Programming, Building Design, AV Bid, and Move-In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - ANSWER Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? - ANSWER System and infrastructure design and facility functionality may suffer What are some of the important project scope and size considerations in selecting an AV provider? - ANSWER Financial Stability, Current Workload, and Company Credentials What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel, and Warranty Response Time? - ANSWER RFQ a significant difference between the Two-Envelope Bid Method and the Qualifications- Based Selection Method? - ANSWER Negotiate with the highest ranking firm to finalize the contract What is one of the disadvantages of contracting the AV integrator to the electrical subcontractor? - ANSWER More layers of responsibility and communication When conducting a complete project bid process, what milestone follows the issuing of the RFP? - ANSWER Pre-Bid Meeting Under what circumstances would you likely use an A305-1986 form? - ANSWER Scoring responses to an RFQ What is the ideal way to contract an AV integrator? - ANSWER Directly to the Owner The process of identifying the activities that end-users need to perform, and developing the functional descriptions of your systems is referred to as:? - ANSWER Needs Analysis What is the main task of the third Step of the Program Phase of a Project? - ANSWER Conducting program meetings What should be included in the written Program Report? - ANSWER ...A conceptual and functional system description The more accurate means to estimate dimensions of a commercial space during a site inspection would be to? - ANSWER Count Ceiling Tiles in a drop tile instalation A client requires a new boardroom. The sales person and engineer are sent to the premises to measure the facility and talk to the client. At this stage they should be performing a _ - ANSWER Needs Analysis Sightlines for audience viewing in a given presentation space can be improved by: - ANSWER Providing a sloped, or stepped, seating arrangement
Written for
- Institution
- CTS Prep 100% VERIFIED 2023//2024
- Course
- CTS Prep 100% VERIFIED 2023//2024
Document information
- Uploaded on
- August 30, 2023
- Number of pages
- 19
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cts exam prep 100 verified solutions
-
cts exam prep 100 verified solutions 20232024
-
cts exam prep 100 verified solutions 20232024