G-60 Exam Questions with Complete Solutions (100% Correct Answers)
- Course
- Institution
The pre-hot work check must be conducted by the responsible person... Correct Answer Once per day Roofing operations should have a _______ fire extinguisher within _______ feet from where the hot-work is performed and where the fire guards are positioned. Correct Answer 3-A:40-B:C, 30 Piped g...