Exam (elaborations)
F60 Fireguard test study guide 2023
- Course
- Institution
For hot work operation with citywide permit, the owner of the premises of the hot work operation areas must be notified in writing by the citywide permit holder ______ the hot work is to be started. - at least 48 hours before The pre-hot work check must be conducted by the responsible person bef...
[Show more]