Exam (elaborations)
NERC Test 1questions With Complete Solutions
- Course
- Institution
NERC Test 1questions With Complete Solutions A misoperation occurred when an overhead ground wire on a 230KV transmission line between two substations broke and fell across A phase of the line. One of the line circuit breakers failed to open causing the breaker failure relay to pick up and as a ...
[Show more]