Exam (elaborations)
NERC Questions with 100% Complete Solutions| Graded to Pass
- Course
- Institution
Two phase conductors of a 138kV transmission line come in contact due to a storm, creating a phase to phase fault. The distance relay at each end of the line tripped and isolated the line. What two measured parameters of the line caused the distance relay to operate? Temperature and length MWs...
[Show more]