NERC Certification Practice Questions | updated 2023/24
NERC Certification Practice Questions | updated 2023/24 Which of the following represents a virtual tie-line updated in real time? - pseudo-tie Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential generation deficiencies each: - day Balancing authorities that share jointly owned generation must include their share of the unit governor droop response into their respective frequency bias setting if the energy is scheduled as a: - dynamic schedule A balancing authority's frequency bias contribution is 30 MW / 0.1 Hz. What is the balancing authority's frequency response due to the external loss of 1,000 MW generator which causes system frequency to decline to 59.95 Hz? - 15 MW A system operator experiences a system failure of AGC and ACE functions. The operator's first priority should be to: - manually calculate ACE and adjust generation to maintain scheduled interchange Interruptible loads may be dispatched to alleviate: - capacity deficiency Telecommunication facilities that link with interconnected systems should be available to the system operator: - on a continuous basis Initial response to frequency decline occurs from what source? - frequency response characteristic One way to obtain load relief during a capacity emergency would be to: - reduce voltage When a system's anticipated operating conditions threaten the reliability of the interconnection, the system strength should be examined and: - other systems
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- October 15, 2023
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc certification practice questions updated 20
Also available in package deal