100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI Written Exam Solved 100% Correct! $11.99   Add to cart

Exam (elaborations)

ACI Written Exam Solved 100% Correct!

 9 views  0 purchase
  • Course
  • Field tech
  • Institution
  • Field Tech

ACI Written Exam Solved 100% Correct!

Preview 2 out of 10  pages

  • October 17, 2023
  • 10
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
  • Field tech
  • Field tech
avatar-seller
ElevatedExcellence
ACI Written Exam Solved 100% Correct!
The sensor of the temperature measureing device shall be submerged a minimum of ____ in CORRECT ANSWERS 3 (75mm)
The temperature measureing device shall have a capacity of measuring temperature of freshly mixed conrcrete to +-_____ degrees F throught a range of _____ CORRECT ANSWERS 1(.5 degrees C), 30-120 (0-50 degrees C)
The temperature measuring device shall be calibrated____, or whenever there is a question of _____ CORRECT ANSWERS annually, accuracy
The temp of concrete may be measured in a wheelbarrow CORRECT ANSWERS true
the temp of concrete may be measured in a wall form CORRECT ANSWERS true
A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temp. CORRECT ANSWERS false
What must be done to the sample container prior to sampling the concrete CORRECT ANSWERS dampen (with water)
what must be done to the concrete surrounding the temp measuring device after the device has submerged CORRECT ANSWERS Press concrete around measuring device
How long must the temp device remain in the concrete CORRECT ANSWERS at least 2 minutes (but no more than 5)
After temp of concrete is read, what then is required CORRECT ANSWERS reporting of
temp
the temp of concrete to be measured to the nearest ____degree F CORRECT ANSWERS 1 (.5 degree C)
According to the ASTM C1064 what is one reason to take the temp of concrete CORRECT ANSWERS verify conformance to a specified requirement for temp
A max temp of concrete is specified in ASTM C1064 CORRECT ANSWERS False
The sample of concrete used for temp determination must be rodded 25 times CORRECT ANSWERS False
Sampling by this method is required when tests are to be made to determine ____ with specification requirements CORRECT ANSWERS compliance The method covers sampling from four types of mixers which are _____, _____, ____, and _______ CORRECT ANSWERS stationary mixes, paving mixers, revolving drum mixers and open top mixers
The maximum allowable time between obtaining the first and final portions of a composite sample is ______ minutes CORRECT ANSWERS 15
Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample CORRECT ANSWERS True
The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temp, and air content is ______ minutes CORRECT ANSWERS 5
the molding of strength test specimens shall begin within ____ minutes after fabricating the composite sample CORRECT ANSWERS 15
The concrete sample must be protected from contamination and ____ CORRECT ANSWERS rapid evaporation
The minimum size sample test specimen is CORRECT ANSWERS 28 L (1ft^3)
when sampling from a stationary mixer the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch CORRECT ANSWERS 2
The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge CORRECT ANSWERS 5
When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of ______ regularly spaced intervals during discharge of the middle portion of the batch CORRECT ANSWERS 2
Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site CORRECT ANSWERS False
The composite sample from a truck mixer must be obtained from the _____ portion of the batch CORRECT ANSWERS Middle
When the concrete contains aggregate larger than permitted for a particular test method, the sample fo concrete must be ______ ______ before making the test CORRECT ANSWERS Wet Sieved

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller ElevatedExcellence. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.99. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

84866 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.99
  • (0)
  Add to cart