100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
ACI EXAM|59 ANSWERED QUESTIONS|DISTINCTION GRADED $8.49   Add to cart

Exam (elaborations)

ACI EXAM|59 ANSWERED QUESTIONS|DISTINCTION GRADED

 2 views  0 purchase
  • Course
  • Institution

ACI EXAM|59 ANSWERED QUESTIONS|DISTINCTION GRADED

Preview 2 out of 5  pages

  • October 22, 2023
  • 5
  • 2023/2024
  • Exam (elaborations)
  • Questions & answers
avatar-seller
ACI EXAM|59 ANSWERED QUESTIONS|
DISTINCTION GRADED
This test method covers sampling from stationary, paving and truck mixers,
and from agitating and non agitating equipment used to transport central
mixed concrete - -True

-When the concrete contains large aggregate, the testing technician should
wet sieve the sample before making unit weight tests for use in yield
computation - -False - cant wet sieve unit weight

-Samples should be taken before 10% or after 90% of the batch has been
discharged. - -False

-Samples smaller than 28L (1 cu.ft.) are allowed on routine air content,
temperature, and slump tests - -True

-Tests for slump and air content must be started within ___ after obtaining
the final portion of the composite sample - -5 minutes

-Start molding strength test specimens within ___ after fabricating the
composite sample - -15 minutes

-How do you regulate the rate of discharge of the batch from the revolving
truck drum mixer or agitator - -By the rate of revolution of the drum

-The mold of the shaper of a ___ - -Frustum of a cone

-The top diameter is ___ and the diameter at the base is __ - -4",8"

-While the technician is checking the slump of the concrete, there is a
decided falling away or shearing off of the concrete from one side of the
sample. What should the technician do? - -Disregard the test and retest on
another portion of the sample

-The mold is filled in three equal layers by volume, which makes the first
third at __ and the second third at ___ - -2 5/8, 6 1/8

-The maximum size of aggregate allowed for slump test is - -1 1/2"

-When ridding the second and third layers the rod should penetrate through
the layer and into the previous layer ___ - -1"

, -The slump of the concrete was determined to be 4 5/16 what should be
recorded as the slump - -4 1/4 - closest quarter

-What's is the maximum amount of time to complete the slump test - -2.5
minutes

-The sides of the slump mold should be lightly tapped to consolidate the
concrete in the mold - -False

-When ridding the final lift additional concrete must be added to keep
excess concrete above the top of the mold at all times - -True

-ASTM C 1064 defines the maximum recommended temperature for
concrete - -False - test standard not a specification standard

-What temperature test method must be complete within ___ after obtaining
the sample - -5 minutes

-Each temperature measuring device should be calibrated ___ or whenever
there is a question of ___ - -Annually, accuracy

-When determining the temperature of fresh concrete what is the minimum
amount of concrete cover in all directions around the sensor of the TMD - -3
inches

-When the concrete contains a minimal maximum size of aggregate greater
than 3 inches it may require ___ before the temperature is stabilized after
mixing - -20 minutes

-After strike off of the measure used to determine density, a small quantity
of concrete may be added to correct a deficiency - -True

-If using any strike off plate the plate must be at least 1 in greater than the
diameter of the measure with which it is being used - -False - 2 inches

-If rodding is the method of consolidation being used, the measure must be
filled in how many layers? - -3 layers

-What is the required shape at the end of the tamping rod - -Rounded to a
hemispheric tip

-After consolidation of the final layer the concrete is 1/2" above the top of
the measure what should be done? - -Remove excess concrete with a scoop
or trowel

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Victorious23. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $8.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76449 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$8.49
  • (0)
  Add to cart